Saved Bookmarks
| 1. |
In a hydroelectric power plant, water is available at the rate of 1.864 m3/sec with an available head of 250 m. The turbines run at a speed of 250 rpm with 70% efficiency. Considering the plant load factor of 0.5, determineAvailable powerType of turbine to be selected & the total number of turbines required |
|
Answer» APPARENTLY the only thing is that it was a NEW song fffeyey you doing recently I was just wondering I want to be in the FUTURE |
|