1.

In system engineering which of the following methods bridges the gap between the two ends of system development?(a) ASM method(b) VSM method(c) Factor method(d) FSM methodThe question was asked in semester exam.This intriguing question comes from Modeling Computations in chapter Boolean Algebra and Modeling Computations of Discrete Mathematics

Answer»

Right answer is (a) ASM method

The best I can explain: An abstract state machine (ASM) has its operations on states that are arbitrary data structures as well as it can BRIDGE the gap between the two ends of the SYSTEM development. This method builds upon three basic concepts such as ASM, GROUND model and refinement.