

InterviewSolution
Saved Bookmarks
1. |
Two successive Iso-hyetes in the basin drawing of catchment area are measured using _______(a) Planimeter(b) Manometer(c) Mass flow meter(d) ChronometerThis question was addressed to me at a job interview.Question is taken from Rainfall and its Measurement topic in chapter Hydro Electric Power Plant of Energy Engineering |
Answer» Right option is (a) PLANIMETER |
|