Which of the below is not to be followed for stone masonry construction?(a) Header stones are dumb-bell shaped(b) Properly cured for 2-3 weeks(c) Construction to be raised uniformly(d) Wetted stones to be usedThis question was posed to me in a job interview.This is a very interesting question from Stone Masonry in division Building Construction of Basic Civil Engineering |
|
Answer» RIGHT answer is (a) HEADER stones are dumb-bell shaped The BEST EXPLANATION: The header and bond stones in stone masonry are not to be of dumb-bell shape.IS code 1597 gives the GENERAL guidelines to be followed by laying the stone in stone masonry. |
|