Which of the following requires design control measures, such as holding and recording design reviews and qualification tests?(a) CMM(b) ISO 9001(c) ISO 9000-3(d) None of the mentionedI had been asked this question during a job interview.Origin of the question is ISO 9001 and CMM in portion Software Maintenance of Software Engineering |
|
Answer» The CORRECT answer is (c) ISO 9000-3 |
|