1.

1). 102). 63). 124). 5

Answer»

Let the work last for x days. Then, A WORKED for (x - 2) days and B for x days.

Now, $(\FRAC{{x - 2}}{8} + \frac{x}{{12}} = 1)$

x = 6 days.