A and B can do a piece of work in 15 days. B and C can do the same work in 10 days and A and C can do the same in 12 days. Time taken by A, B and C together to do the Job is1). 4 days2). 9 days3). 8 days4). 5 days |
| Answer» 8 DAYS is the BEST SUITED | |