InterviewSolution
Saved Bookmarks
| 1. |
A can do a piece of work in 6 days and B can do it in 4 days separately. How many days would it take for both A and B to finish the same work together?1). 12/72). 12/153). 24/104). 11/5 |
|
Answer» Given that, A can do a task in 6 days. ∴ 1 DAY’s work by A = 1/6 Also, B can do it in 4 days ∴ 1 day’s work by B = 1/4 1 day’s work by both A and B together = $(\frac{1}{6}\; + \;\frac{1}{4}\; = \;\frac{{2\; + \;3}}{{12}}\; = \;\frac{5}{{12}})$ To do the whole work, time taken by A and B together = $(\frac{1}{{\frac{5}{{12}}}}\; = \;\frac{{12}}{5}\; = \;\frac{{24}}{{10}})$ |
|