If 10 men can do a piece of work in 12 days, then what will be the time taken by 12 men to do the same piece of work?1). 12 days2). 10 days3). 9 days4). 8 days |
|
Answer» When 10 MEN WORK for 12 days, then Total work = 10 × 12 = 120 12 men can COMPLETE the work = 120/12 = 10 days |
|