Suman can do a work in 3 days. Sumati can do the same work in 2 days. Both of them finish the work together and get Rs. 150. What is the share of Suman ?1). Rs. 302). Rs. 603). Rs. 704). Rs. 75 |
| Answer» RS. 60 is the CORRECT answer as per the SSC answer key | |