1.

What Are The Stages Of Production Planning & Control?

Answer»

Production Planning & Control is done in three stages namely,

  1. Pre-planning
  2. Planning
  3. Control.

Stage 1: Pre-Planning : Under this phase of production planning, basic ground work on the product design, layout design and work flow are prepared. The operations RELATING to the availability scope and capacity of men, MONEY materials, machines, time are ESTIMATED.

Stage 2: Planning : This is a phase where a complete analysis on routing, estimating and scheduling is done. It also TRIES to find out the areas of concern for short time and LONG time so that prominent planning can be prepared.

Stage 3: Control : Under this phase, the functions included are dispatching, follow up, inspection and evaluation. It tries to analyze the expedition of work in progress. This is one of the important phases of the Production Planning and Control.

Production Planning & Control is done in three stages namely,

Stage 1: Pre-Planning : Under this phase of production planning, basic ground work on the product design, layout design and work flow are prepared. The operations relating to the availability scope and capacity of men, money materials, machines, time are estimated.

Stage 2: Planning : This is a phase where a complete analysis on routing, estimating and scheduling is done. It also tries to find out the areas of concern for short time and long time so that prominent planning can be prepared.

Stage 3: Control : Under this phase, the functions included are dispatching, follow up, inspection and evaluation. It tries to analyze the expedition of work in progress. This is one of the important phases of the Production Planning and Control.