Explore topic-wise InterviewSolutions in .

This section includes InterviewSolutions, each offering curated multiple-choice questions to sharpen your knowledge and support exam preparation. Choose a topic below to get started.

1.

Fluctuation in flow occurs from hour to hour and from season to season.(a) True(b) FalseThe question was posed to me in an interview.Asked question is from Schedule of Rates for Water Supply works topic in section Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Right choice is (a) True

The BEST I can EXPLAIN: Variation occurs in the flow of sewage over annual average daily flow. Fluctuation in flow occurs from hour to hour and from season to season. If the flow is gauged near its ORIGIN, the peak flow will be quite pronounced. The peak will DEFER if the sewage has to travel long distance. This is because of the time required in collecting sufficient QUANTITY of sewage required to fill the sewers and time required in travelling.

2.

For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is _________(a) 0.190 m^3(b) 0.230 m^3(c) 0.174 m^3(d) 0.274 m^3The question was asked during an online exam.I'd like to ask this question from Labour Rates for Workers topic in portion Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Correct answer is (d) 0.274 m^3

The best I can explain: GIVEN volume = 100*.012 = 1.2cum.

Increase mortar by 30% = 1.56cum.

For volume of DRY mortar increase 25% = 1.56+ (1.56*.25) = 1.95cum.

Now proportion = 1:6.

k+6k = 7k.

So volume of cement = (1/7) * 1.95 = 0.2785.

3.

The future period for which the provision is made in designing the capacities of the various components of the sewerage scheme is known as the ______________(a) Design period(b) Manufacture time(c) Construction work(d) Repair workI got this question in my homework.This intriguing question originated from Schedule of Rates for Water Supply works in portion Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

The correct answer is (a) Design period

Explanation: The design period DEPENDS UPON the following:

-Ease and difficulty in expansion,

-Amount and availability of investment,

-Anticipated rate of population growth, including shifts in communities, INDUSTRIES and

commercial investments,

-HYDRAULIC constraints of the systems DESIGNED, and

-Life of the material and equipment.

4.

DA and HRA are same concepts.(a) True(b) FalseThe question was posed to me during an interview.This interesting question is from Labour Rates for Workers in division Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Right option is (b) False

Easiest explanation: DA or dearness allowance is calculated as a SPECIFIC percentage of the basic salary which is then added to the basic salary ALONG with other components like HRA (House RENT Allowance) to make up the total salary of an employee of the government sector.

HRA or House Rent Allowance is the salary COMPONENT given by an employer to an employee in order to meet expenses related to the renting of accommodation which the employee takes for residential purposes.

5.

______________ is the most high risk activity in the construction sector.(a) Shuttering(b) Demolition(c) Pointing(d) PlasteringThis question was posed to me by my college director while I was bunking the class.The above asked question is from Schedule of Rates for Different Used Material topic in portion Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Right choice is (b) Demolition

Explanation: The ESSENCE of safe demolition lies in efficient risk control, environmental management and careful planning. The CDM Regulations have provided a platform from which the industry exhibits best PRACTICE, DEMANDING written plans of WORK for demolition EVEN where a project is not notifiable.

6.

The per capita sewage generation can be considered as 35 to 50% of the per capita water supplied per day.(a) True(b) FalseThis question was addressed to me at a job interview.I want to ask this question from Schedule of Rates for Water Supply works topic in chapter Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Correct option is (b) False

Best explanation: The per capita sewage generation can be considered as 75 to 80% of the per capita WATER supplied per day. The increase in POPULATION ALSO result in increase in per capita water demand and hence, per capita production of sewage. This increase in water demand occurs due to increase in living standards, BETTERMENT in economic condition, changes in habit of people, and enhanced demand for public utilities.

7.

As per IS: 1172-1963, water required per head per day for average domestic purposes, is?(a) 120 litres(b) 135 litres(c) 75 litres(d) 195 litresThe question was posed to me by my school principal while I was bunking the class.My question is taken from Schedule of Rates for Water Supply works topic in section Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer» CORRECT OPTION is (b) 135 litres

Best EXPLANATION: For domestic purposes – 135 litres to 225 litres,

For industrial purposes – 50 litres to 450 litres.
8.

Which among the following quantity is considered while estimating the sewage quantity?(a) Addition due to unaccounted private water supplies(b) Addition due to infiltration(c) Subtraction due to water losses(d) Addition due to unaccounted private water supplies, infiltration and water lossesThis question was addressed to me in quiz.My question is based upon Schedule of Rates for Water Supply works topic in division Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Correct answer is (d) Addition due to UNACCOUNTED private water SUPPLIES, infiltration and water losses

Easy explanation: Addition due to infiltration-This is additional quantity due to groundwater seepage in to sewers through faulty joints or cracks formed in the pipes. The quantity of the water depends upon the height of the water table above the sewer invert level.

Addition due to unaccounted private water supplies- People using water supply from private wells, tube wells, etc. contribute to the wastewater generation more than the water supplied by municipal authority. Similarly, certain INDUSTRIES utilize their own source of water.

Subtraction due to water losses -The water loss, through leakage in water distribution system and house connections, does not reach consumers and HENCE, not appear as SEWAGE.

9.

Brick walls are measured in sq. m if the thickness of the wall is?(a) 9 cm(b) 10 cm(c) 5 cm(d) 18 cmThe question was posed to me during an interview.The above asked question is from Labour Rates for Workers in division Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Correct option is (b) 10 cm

Best explanation: 10cm, Actually in INDIA HALF brick thick wall is 115 MM thick. Half brick MODULAR brick wall is 10cm. Thick including thickness of plaster. However plaster is paid SEPARATELY in both the cases. In India half brick thick wall is paid in sq.meter.

10.

The minimum rates of wages may also include the basic rates and _____________(a) variable Dearness Allowance(b) real wages(c) bonus(d) provident fundThe question was asked at a job interview.Question is from Labour Rates for Workers topic in portion Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Right OPTION is (a) variable Dearness Allowance

Easiest EXPLANATION: Dearness Allowance is COST of living adjustment allowance which the government pays to the employees of the public sector as well as pensioners of the same. DA component of the SALARY is APPLICABLE to both employees in India and Bangladesh.

11.

The expected out turn of cement concrete for 1 : 2 : 4 per mason per day is 5.(a) True(b) FalseThe question was asked by my school teacher while I was bunking the class.My doubt stems from Labour Rates for Workers topic in chapter Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Correct choice is (a) True

The explanation is: For 1 : 2 : 4 CONCRETE, 1m^3 need Labour constant.

Mixing concrete = 3.00 hour/m^3.

Lifting and carrying concrete = 1.20 hour/m^3.

Compacting concrete = 0.80 hour/m^3.

Levelling SURFACE of concrete = 0.10 hour/m^3.

Total= (3+1.2+0.8+0.1) = 5.

12.

Cost of fittings and their fixing is specified for the following sanitary fittings.(a) Water closets(b) Flushing pipes(c) Lavatory basins(d) Water closets, Flushing pipes and lavatory basinsThe question was asked in an internship interview.Question is from Schedule of Rates for Water Supply works in section Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Right choice is (d) WATER closets, Flushing pipes and lavatory basins

The best I can explain: A FITTING is used in pipe systems to connect STRAIGHT pipe or tubing sections, adapt to different sizes or shapes and for other purposes, such as regulating (or measuring) fluid flow. “Plumbing” is generally used to describe the conveyance of water, gas, or liquid WASTE in domestic or commercial environments; “piping” is often used to describe the high-performance (high-pressure, high-flow, high-temperature or hazardous-material) conveyance of fluids in SPECIALIZED applications. “Tubing” is sometimes used for lighter-weight piping, especially that flexible enough to be supplied in coiled form.

Fittings (especially uncommon types) require money, time, materials and tools to install, and are an important part of piping and plumbing systems. Valves are technically fittings but are usually discussed separately.

13.

Turbidity of raw water is a measure of _____________(a) Suspended solids(b) Acidity of water(c) B.O.D(d) Repair WorkThis question was addressed to me in an online interview.My question is based upon Schedule of Rates for Water Supply works topic in portion Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

The correct choice is (a) Suspended SOLIDS

For EXPLANATION I would SAY: The definition of Turbidity is the cloudiness or haziness of a fluid caused by suspended solids that are usually invisible to the naked eye. The measurement of Turbidity is an important test when trying to DETERMINE the quality of water. It is an aggregate optical property of the water and does not identify INDIVIDUAL substances; it just says something is there.

14.

The expected out turn of 2.5 cm cement concrete floor per manson per day?(a) 1.5 sq. m(b) 0.5 sq. m(c) 7.5 sq. m(d) 2.5 sq. mI got this question in a job interview.Enquiry is from Labour Rates for Workers in division Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Correct answer is (c) 7.5 SQ. m

The EXPLANATION is: For 100 sum, no. of Mason is 13 no.

i.e for 13 Mason flooring is 100 square meter.

So for 1 Mason flooring is 100/13 = 7.69 sum.

15.

In its most simple form, a _______________ can be a list in a contract setting out the staff, labour and plant hire rates the contractor will use for pricing cost reimbursable instructed daywork.(a) list(b) plan(c) scheme(d) schedule of ratesThis question was posed to me in semester exam.This intriguing question originated from Schedule of Rates for Different Used Material topic in chapter Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

The correct OPTION is (a) list

Explanation: HOWEVER, on a much larger scale, a ‘schedule of rates term contract’, ‘term contract’ or ‘MEASURED term contract’ may be used when the nature of work required is known but it cannot be quantified, or if continuity of PROGRAMME cannot be determined. In the absence of an estimate, tenderers quote unit rates against a document that is INTENDED to cover all likely activities that might form part of the works.

16.

What is the schedule rate for a road roller including POL in Lucknow?(a) Rs.200(b) Rs.1000(c) Rs.2000(d) Rs.450I got this question in a national level competition.This question is from Schedule of Rates for Different Used Material topic in section Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Correct answer is (b) Rs.1000

For explanation I would say: A road roller (sometimes called a roller-COMPACTOR, or just roller) is a compactor type engineering VEHICLE used to compact soil, GRAVEL, concrete, or asphalt in the construction of roads and FOUNDATIONS. SIMILAR rollers are used also at landfills or in agriculture.

17.

What is the detention period in a septic tank?(a) 24 hours(b) 12 hours(c) 06 hours(d) 36 hoursI got this question by my college director while I was bunking the class.Question is taken from Schedule of Rates for Water Supply works topic in section Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

The correct choice is (a) 24 hours

The explanation is: DETENTION period of 24hrs (mostly) considered in SEPTIC tank DESIGN. The rate of flow of EFFLUENT MUST be equal to the rate of flow of influent.

18.

What is the scheduled rate for Semi-Skilled/Unskilled Supervisory in New Delhi for area A?(a) Rs.173(b) Rs.273(c) Rs.373(d) Rs.123I got this question in semester exam.This is a very interesting question from Labour Rates for Workers topic in chapter Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

The correct choice is (C) Rs.373

For explanation: A SEMISKILLED worker is one who does work generally of defined routine nature wherein the major requirement is not so much of the judgment, skill and but for proper discharge of duties assigned to him or RELATIVELY narrow job and where important decisions made by others. His work is thus LIMITED to the performance of routine OPERATIONS of limited scope.

19.

Which among the following comes under basic wages?(a) Cash value of any food concession(b) Any dearness allowance(c) House rent allowance, overtime allowance, bonus, presents(d) Pay for a standard work periodThis question was addressed to me at a job interview.I want to ask this question from Labour Rates for Workers topic in chapter Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer» CORRECT choice is (d) Pay for a standard work period

The explanation: Basic wages have been defined to mean all cash emoluments, EXCEPT:

-Cash value of any food concession;

-Any dearness allowance;

-House rent allowance, overtime allowance, BONUS, PRESENTS and

-Commission or any other similar allowance.

The concept of basic wages on which PF contribution is to be calculated has always been a debatable issue. The Supreme Court has laid down two tests to determine whether a component is included in the definition of basic wages or not. These are test of universality and test of CONTINGENCY.
20.

What is the schedule rate for Shisham wood in Lucknow?(a) Rs.380/cu m(b) Rs.11000/cu m(c) Rs.12080/cu m(d) Rs.2300/cu mI got this question in an online quiz.Asked question is from Schedule of Rates for Different Used Material in division Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Correct choice is (b) Rs.11000/cu m

Explanation: SHISHAM is best known economic TIMBER species of the rosewood genus sold internationally, but it is also USED as fuel wood and for shade and shelter. With its tolerance of light frosts and long dry seasons, this species deserves greater consideration for TREE farming, agro forestry and DECIDUOUS reforestation. After teak, it is the most important cultivated timber tree of Bihar, which is the largest producer of shisham timber in India.

21.

A city has a projected population of 60,000 spread over area of 50 hectare. Find the design discharge for the separate sewer line by assuming rate of water supply of 250 LPCD and out of this total supply only 75 % reaches in sewer as wastewater. Make necessary assumption whenever necessary.(a) 0.26 m^3/s(b) 0.6 m^3/s(c) 0.76 m^3/s(d) 3.26 m^3/sI got this question during an online interview.The above asked question is from Schedule of Rates for Water Supply works in section Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

The correct choice is (a) 0.26 m^3/s

Explanation: Given data, Q = 250 lit/capita/day

SEWAGE FLOW = 75% of water supply = 0.75* 250 = 187.5 LPCD

Total sewage generated = 187.5*60000/(24*3600) = 130.21 lit/sec = 0.13 m^3/s

Assume peak factor = 2

Total design discharge = 0.26 m^3/s.

22.

What is the schedule rate for a Riveter in Lucknow?(a) Rs.140(b) Rs.500(c) Rs.350(d) Rs.80The question was asked in homework.Question is from Schedule of Rates for Different Used Material topic in portion Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

The correct CHOICE is (c) Rs.350

For explanation: A rivet is a permanent mechanical fastener. Before being installed, a rivet consists of a SMOOTH CYLINDRICAL shaft with a head on ONE end. The end opposite to the head is called the tail. On installation, the rivet is placed in a PUNCHED or drilled hole, and the tail is upset, or bucked (i.e., deformed), so that it expands to about 1.5 times the original shaft diameter, holding the rivet in place.

23.

What is the diameter of a domestic sewer pipe laid at gradient 1 in 100?(a) 150 mm(b) 250 mm(c) 120 mm(d) 80 mmI got this question in an internship interview.This question is from Schedule of Rates for Water Supply works in portion Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

The correct OPTION is (a) 150 MM

For explanation I WOULD say: Following are some recommendations for domestic sewer pipe.

100 mm – 1 in 60.

150 mm – 1 in 100.

200 mm – 1 in 120.

24.

Great skill and skilled labour is required for laying _____________(a) dry rubble masonry(b) ashlar chamfered masonry(c) ashlar fine masonry(d) coursed rubble masonryI got this question in examination.I'd like to ask this question from Labour Rates for Workers in division Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Right option is (a) dry rubble MASONRY

Best explanation: In dry rubble masonry, mortar is not USED. Great SKILL is required to arrange different sized and shaped stones in such a way that they don’t ROLL down or fall down after a while.

25.

Industrial dearness allowance is the not an allowance applicable to employees of the public sector enterprises.(a) True(b) FalseI had been asked this question in my homework.The query is from Labour Rates for Workers in division Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

The correct choice is (b) False

Explanation: Industrial dearness allowance or IDA is the allowance applicable to employees of the public SECTOR enterprises. Recently, the government of the India has INCREASED IDA by 5% for this sector. This decision is set to benefit all board level executives, officers and employees of central PSUs.

IDA for government sector enterprises is revised quarterly based on the movement of the Consumer PRICE Index (CPI) in order to compensate for the rising inflation in the country.

26.

Which among the following is not an advantage of schedule of rates?(a) The client can stop and start work at a pace that might be determined by cash flow or funding(b) It is flexible in relation to scope and contractual commitment(c) A larger pool of contractors can be asked to tender as the process is inexpensive and quick(d) Additional resources are required to measure work and certify paymentsThe question was asked in an interview for internship.My question is from Schedule of Rates for Different Used Material topic in portion Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Right option is (d) Additional resources are required to measure work and certify payments

To ELABORATE: Option “Additional resources are required to measure work and certify payments” is disadvantage.

The disadvantages include:

• Additional resources are required to measure work and certify payments.

• The CLIENT does not have a final PRICE when committing to starting work.

• It is difficult for contractors to plan long-term resources and so might mean changes to personnel with loss of continuity.

• Contractors may be tempted to front-load costs in case later work does not materialise.

• There is no real INCENTIVE for contractors to treat such work with any sense of urgency and its best staff will be placed on the projects where the contractor is CARRYING more risk.

27.

What is the schedule rate for a Glazier in Lucknow?(a) Rs.50(b) Rs.350(c) Rs.320(d) Rs.120I have been asked this question in final exam.My query is from Schedule of Rates for Different Used Material in section Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer» CORRECT answer is (c) Rs.320

The BEST EXPLANATION: A GLAZIER is a skilled tradesman responsible for cutting, installing, and removing glass (and materials used as substitutes for glass, such as some plastics). Glaziers may work with glass in various surfaces and settings, such as WINDOWS, doors, shower doors, skylights, storefronts, display cases, mirrors, facades, interior walls, ceilings, and tabletops.
28.

In the construction industry ____________ is a very general term which refers to organisations contracted as part of the delivery of a built asset.(a) transporter(b) supplier(c) organisation(d) industryThe question was asked in an interview.My doubt stems from Schedule of Rates for Different Used Material topic in portion Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Right option is (b) supplier

The BEST explanation: TRADITIONALLY, suppliers might have been considered to be organisations contracted to provide physical supplies such as goods, materials, plant, and so on, however, its USE is now much broader and PAS 1192-2 defines a supplier as any ‘provider of SERVICES or goods either directly to the employer or to another supplier in a SUPPLY chain’. The ‘supply chain’ is the interconnected hierarchy of suppliers.

29.

Disinfection of drinking water is done to remove odour.(a) True(b) FalseI got this question by my college director while I was bunking the class.I'd like to ask this question from Schedule of Rates for Water Supply works in division Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer» CORRECT choice is (b) False

For explanation: WATER disinfection MEANS the removal, deactivation or killing of pathogenic microorganisms. Microorganisms are destroyed or deactivated, resulting in termination of growth and reproduction. When microorganisms are not removed from drinking water, drinking water usage will CAUSE PEOPLE to fall ill.
30.

Pick up the correct statement in case of water supply.(a) Pipes laid in trenches and pipes fixed to walls are measured separately(b) Cutting through walls and floors are included with the item(c) Pipes are classified according to their sizes and quality(d) Pipes laid in trenches, cutting through walls and pipes classified as per sizeThis question was addressed to me in my homework.The query is from Schedule of Rates for Water Supply works topic in chapter Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Right choice is (d) Pipes laid in trenches, cutting through walls and pipes CLASSIFIED as per size

Easy explanation: The product, delivered to the point of consumption, is called potable water if it meets the water QUALITY standards required for human consumption.

The water in the supply network is maintained at positive pressure to ensure that water reaches all parts of the network, that a sufficient flow is available at every take-off point and to ensure that untreated water in the ground cannot enter the network. The water is typically PRESSURISED by pumps that pump water into storage TANKS constructed at the highest local point in the network. One network may have several such service reservoirs.

In small domestic systems, the water may be pressurised by a pressure vessel or even by an underground cistern (the latter however does need additional pressurizing). This eliminates the need of a water-tower or any other heightened water RESERVE to supply the water pressure.

31.

What is the schedule rate for a Blacksmith in Lucknow?(a) Rs.350(b) Rs.150(c) Rs.30(d) Rs.150I have been asked this question in an international level competition.Asked question is from Schedule of Rates for Different Used Material in division Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Correct choice is (a) Rs.350

Explanation: A blacksmith is a metalsmith who creates objects from wrought iron or STEEL by FORGING the metal, using tools to hammer, bend, and cut (cf. whitesmith). BLACKSMITHS produce objects such as gates, GRILLES, railings, light fixtures, furniture, sculpture, tools, agricultural implements, decorative and religious items, cooking utensils etc.

32.

What is the scheduled rate for Clerical in New Delhi for area B?(a) Rs.373(b) Rs.320(c) Rs.290(d) Rs.125I got this question during an interview.This intriguing question originated from Labour Rates for Workers in portion Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Correct CHOICE is (a) Rs.373

Explanation: Clerical work typically refers to a VARIETY of OFFICE and administrative support duties. If you’re interested in a career in clerical work, read on to learn more about the NATURE of the PROFESSION and the variety of occupations available. Schools offering Office Management degrees can also be found in these popular choices.