InterviewSolution
Saved Bookmarks
| 1. |
The future period for which the provision is made in designing the capacities of the various components of the sewerage scheme is known as the ______________(a) Design period(b) Manufacture time(c) Construction work(d) Repair workI got this question in my homework.This intriguing question originated from Schedule of Rates for Water Supply works in portion Schedule of Rates Metric and F.B of Civil Engineering Drawing |
|
Answer» The correct answer is (a) Design period |
|