The expected out turn of 2.5 cm cement concrete floor per manson per day?(a) 1.5 sq. m(b) 0.5 sq. m(c) 7.5 sq. m(d) 2.5 sq. mI got this question in a job interview.Enquiry is from Labour Rates for Workers in division Schedule of Rates Metric and F.B of Civil Engineering Drawing

Answer»

Correct answer is (c) 7.5 SQ. m

The EXPLANATION is: For 100 sum, no. of Mason is 13 no.

i.e for 13 Mason flooring is 100 square meter.

So for 1 Mason flooring is 100/13 = 7.69 sum.