| 1. |
The absolute minimum sight distance required for stopping a vehicle moving with a speed of 80 km ph, is ____________(a) 100 cm(b) 120 cm(c) 40 cm(d) 60 cmI have been asked this question in an interview for internship.This interesting question is from Detailed Specifications of Road Work topic in section Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct answer is (b) 120 cm |
|
| 2. |
In ideal pavement is constructed with _________(a) bricks(b) hard soil(c) portland cement concrete(d) tarI have been asked this question in semester exam.Asked question is from Detailed Specifications of Road Work topic in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct answer is (c) portland CEMENT CONCRETE |
|
| 3. |
What will be the ruling gradient in hills on “Other district roads”?(a) 1 in 20(b) 1 in 5(c) 1 in 10(d) 1 in 3The question was posed to me during an interview for a job.This intriguing question originated from General Specifications of Modern Road in section Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct answer is (c) 1 in 10 |
|
| 4. |
For controlling the amount of water in cement regular moisture test should be carried out to maintain the required consistency.(a) True(b) FalseI got this question in an online quiz.I would like to ask this question from Detailed Specifications topic in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct option is (B) False |
|
| 5. |
For first class building roof shall be of R.C.C. slab.(a) True(b) FalseThis question was posed to me during a job interview.This intriguing question comes from General Specifications topic in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct ANSWER is (a) True |
|
| 6. |
Water, if any accumulates in the trench, should be bailed or pumped out without any extra payment.(a) True(b) FalseThis question was posed to me during an internship interview.My query is from Detailed Specifications in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct option is (a) True |
|
| 7. |
For 2nd class building superstructure shall be of 1st class brickwork in lime mortar.(a) True(b) FalseThis question was posed to me in a national level competition.Question is from General Specifications in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Right option is (b) False |
|
| 8. |
General specification gives the nature and the class of the work and the materials in general terms.(a) True(b) FalseI have been asked this question in examination.The doubt is from General Specifications topic in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct OPTION is (a) True |
|
| 9. |
For fourth class building roofing shall be of __________ over bamboo and wooden supports.(a) Mud roof(b) Tile roof(c) Wooden roof(d) Bamboo roofThis question was posed to me during an interview.I need to ask this question from General Specifications in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct option is (b) Tile roof |
|
| 10. |
Which type of door does the figure show?(a) Hinged doors(b) Folding door(c) Rotating door(d) Automatic doorThis question was addressed to me in examination.I would like to ask this question from Estimate of Materials for Different House Parts topic in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» RIGHT ANSWER is (B) FOLDING door To elaborate: None. |
|
| 11. |
1st class brick shall be soaked in clean water by submerging in a tank for a period of 2 hours immediately before use.(a) True(b) FalseThe question was posed to me during an interview for a job.Question is from Detailed Specifications topic in section Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Right choice is (b) False |
|
| 12. |
The usual width of parapet walls along Highways in hilly region, is ____________(a) 60 cm(b) 20 cm(c) 70 cm(d) 40 cmThis question was addressed to me during an online interview.My question is based upon Detailed Specifications of Road Work in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct option is (a) 60 cm |
|
| 13. |
What will be the minimum visibility at vertical curves on National Highway?(a) 130 m(b) 200 m(c) 20 m(d) 100 mThe question was asked in unit test.The query is from General Specifications of Modern Road topic in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct option is (d) 100 m |
|
| 14. |
Hard, rough and durable granite stone ballast _________ gauge, shall be used.(a) 100 mm(b) 20 mm(c) 1mm(d) 60mmThe question was posed to me during an interview.I need to ask this question from General Specifications of Modern Road topic in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct CHOICE is (d) 60mm |
|
| 15. |
Ideally, architects of houses design rooms to meet the needs of the people who will live in the house, this is known as ___________(a) planning(b) layout(c) finishing(d) interior designThe question was posed to me during a job interview.I want to ask this question from Estimate of Materials for Different House Parts topic in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct choice is (d) interior design |
|
| 16. |
For third class building flooring shall be of brick-on-edge floor over well rammed earth.(a) True(b) FalseThis question was addressed to me in an interview.My question is from General Specifications topic in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Right answer is (a) True |
|
| 17. |
The head of public works department of any Indian state, is ____________(a) Transport Minister(b) Chief Engineer(c) Superintending Engineer(d) Executive EngineerI have been asked this question in homework.My question is based upon Detailed Specifications of Road Work in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Right answer is (b) Chief Engineer |
|
| 18. |
The weight of vehicles affects ____________(a) pavement thickness(b) ruling gradient(c) limiting gradient(d) pavement thickness, ruling gradient and limiting gradientI got this question in an interview.My doubt stems from Detailed Specifications of Road Work in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct ANSWER is (d) pavement thickness, ruling gradient and limiting gradient |
|
| 19. |
Horizontal boards at the top, bottom, and optionally in the middle of a door that join the two stiles and split the door into two or more rows of panels is known as ______________(a) panels(b) mullions(c) stiles(d) railsThis question was posed to me during an online interview.This intriguing question comes from Estimate of Materials for Different House Parts in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct CHOICE is (d) RAILS |
|
| 20. |
What will be the maximum superrelevation in hills on Major District roads?(a) 4 in 30(b) 1 in 10(c) 1 in 4(d) 1 in 60I have been asked this question at a job interview.I would like to ask this question from General Specifications of Modern Road topic in section Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Right answer is (b) 1 in 10 |
|
| 21. |
An Executive Engineer of roads, executes works under direct control of _________(a) Superintending Engineer(b) Secretary to the Govt(c) Chief Engineer(d) Junior engineerThis question was posed to me by my college professor while I was bunking the class.Question is taken from Detailed Specifications of Road Work topic in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct choice is (a) Superintending Engineer |
|
| 22. |
Reinforcement in cement concrete slab of road pavements, is placed ____________(a) longitudinally(b) longitudinally and transversely(c) in the form of welded wire mesh(d) transverselyI had been asked this question during an interview.This intriguing question comes from Detailed Specifications of Road Work in section Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Right CHOICE is (c) in the form of welded wire mesh |
|
| 23. |
Volume of traffic which would immediately use a new road or an improved one when opened to traffic is known as ___________(a) general traffic(b) development traffic(c) normal traffic growth(d) current trafficThis question was addressed to me during an online interview.This interesting question is from Detailed Specifications of Road Work in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct CHOICE is (c) normal traffic GROWTH |
|
| 24. |
The road foundation for modern highways construction, was developed by ____________(a) Tresguet(b) Telford(c) Macadam(d) Telford and Macadam simultaneously.I got this question during an interview.This intriguing question originated from Detailed Specifications of Road Work topic in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct choice is (d) Telford and Macadam simultaneously. |
|
| 25. |
If subgrade is soft or weak, a thick sub-base of cheap and inferior materials well compacted should be used.(a) False(b) TrueI got this question in a national level competition.My doubt is from General Specifications of Modern Road in section Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» CORRECT choice is (B) True The best I can explain: In transport engineering, subgrade is the NATIVE material underneath a constructed road, pavement or railway (US: railroad) track. It is also called formation level. The term can also refer to imported material that has been used to BUILD an embankment. |
|
| 26. |
What will be the width of metalled surface single lane on Major District road?(a) 1.70 m(b) 3.70 m(c) 0.70 m(d) 10 mI got this question by my college director while I was bunking the class.The above asked question is from General Specifications of Modern Road in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Right option is (b) 3.70 m |
|
| 27. |
For First class building drawing room and dining room floors shall be of __________(a) Concrete(b) Tiles(c) Mosaic(d) WoodenI got this question in an interview.This question is from General Specifications in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct OPTION is (c) Mosaic |
|
| 28. |
A brick laid on the long narrow side with the broad face of the brick exposed is known as ______________(a) shiner(b) header(c) sailor(d) soldierI have been asked this question in final exam.I would like to ask this question from Estimate of Materials for Different House Parts in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct answer is (b) header |
|
| 29. |
Enoscope is used to determine ___________(a) spot speed(b) average speed(c) travel time(d) average timeThe question was posed to me in quiz.My question is based upon Detailed Specifications of Road Work in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct choice is (a) spot speed |
|
| 30. |
Driving vehicles on wet surfaced roads, is dangerous because it may ___________(a) overturn(b) slip(c) skid(d) slip and skidThis question was posed to me during an online interview.My doubt is from Detailed Specifications of Road Work in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct answer is (B) slip |
|
| 31. |
Specification does not specify or describes the nature and the class off the work, materials to be used in the work, workmanship, etc.(a) False(b) TrueI have been asked this question in an internship interview.This interesting question is from General Specifications topic in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct choice is (a) False |
|
| 32. |
For 2nd class building rain water pipes shall be of ______________ finished painted.(a) Cast iron(b) Bog iron(c) Brown ore(d) PyriteThis question was posed to me in semester exam.I'd like to ask this question from General Specifications topic in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Right choice is (a) Cast IRON |
|
| 33. |
A half door or Dutch door or stable door is divided in half horizontally.(a) True(b) FalseI have been asked this question in final exam.This key question is from Estimate of Materials for Different House Parts topic in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct CHOICE is (a) True |
|
| 34. |
The detailed specification of an item of work specifies the qualities and quantities of materials, the proportion of mortar, workmanship, the method of preparation.(a) True(b) FalseI have been asked this question in an online quiz.I'm obligated to ask this question of Detailed Specifications in section Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The CORRECT OPTION is (a) True |
|
| 35. |
What will be the design load for bridges and culverts on National Highway?(a) I.R.C. Class-D loading(b) I.R.C. Class-C loading(c) I.R.C. Class-A loading(d) I.R.C. Class-B loadingI got this question in my homework.My question is from General Specifications of Modern Road topic in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Right option is (c) I.R.C. Class-A loading |
|
| 36. |
A brick laid flat with its long narrow side exposed is known as ____________(a) stretcher(b) header(c) rowlock(d) shinerThis question was addressed to me by my school teacher while I was bunking the class.My question is from Estimate of Materials for Different House Parts in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» CORRECT answer is (a) STRETCHER For explanation I would say: It is a brick or a stone which lies with its longest side parallel to the face of the WORK. The COURSE of brick work in which all the BRICKS are laid as stretchers is known as stretcher course. |
|
| 37. |
Specifications are of two types- General specification or brief specification and __________________(a) Short specification(b) General specification(c) Detailed specification(d) Brief specificationThis question was addressed to me during an interview for a job.I need to ask this question from General Specifications topic in section Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct answer is (c) Detailed specification |
|
| 38. |
For fourth class building the doors and windows shall be of _________ wood or country wood.(a) Sal(b) Neem(c) Teak(d) MangoI have been asked this question in my homework.My doubt stems from General Specifications topic in section Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» CORRECT choice is (d) Mango Easiest EXPLANATION: Technically mango is a hardwood with dense grains, so it has the strength to bear the WEIGHT necessary for chairs and HEAVY tables, but it’s still soft enough that it’s relatively easy to work with, requiring no special tools on behalf of the manufacturers. Mango FURNITURE can stand the wear and tear of time as well as your grandmother’s oak kitchen table, but, unlike traditional hardwood furniture, it’s more affordable and, as we’ll get into, completely sustainable. |
|
| 39. |
Which type of bond does the figure below represents?(a) flemish bond(b) monk bond(c) sussex bond(d) english bondThis question was posed to me in unit test.This interesting question is from Estimate of Materials for Different House Parts in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Right answer is (a) FLEMISH bond |
|
| 40. |
First coat of bituminous painting shall be with stone ballast no.3 and stone grit of 20 mm gauge at 220 kg of asphalt and 1.35 cu m of stone grit per 100 sq. m.(a) True(b) FalseThe question was posed to me in an interview for job.The origin of the question is General Specifications of Modern Road in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct choice is (B) False |
|
| 41. |
Bricks shall be well bonded and laid in English bond unless otherwise specified.(a) True(b) FalseI got this question during an interview.The origin of the question is Detailed Specifications in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The CORRECT choice is (a) True |
|
| 42. |
Steel reinforcing bars shall be of mild steel or deformed steel of standard specifications.(a) True(b) FalseThe question was posed to me during an online exam.The question is from Detailed Specifications in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct ANSWER is (a) True |
|
| 43. |
As soon as sufficient length of premix has been laid, rolling should be started with 2 to 4 tonne roller.(a) True(b) FalseThis question was posed to me in exam.I'm obligated to ask this question of General Specifications of Modern Road topic in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Right option is (b) False |
|
| 44. |
Which authority is responsible for national highway?(a) Local governments and municipalities(b) Panchayats, JRY and PMGSY(c) Public Works Department of State/Union Territory(d) Ministry of Road Transport and HighwaysI have been asked this question during an interview.My question is from General Specifications of Modern Road topic in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct answer is (d) Ministry of Road TRANSPORT and Highways |
|
| 45. |
Stone grits used for 1st coat and 2nd surface painting may be precoated in advance with advance with bitumen.(a) True(b) FalseI had been asked this question in a job interview.Question is taken from General Specifications of Modern Road topic in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct ANSWER is (a) True |
|
| 46. |
Subgrade shall be well consolidated and compacted each with a camber of 1 in 60.(a) True(b) FalseThis question was addressed to me in class test.Question is taken from General Specifications of Modern Road topic in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» Correct ANSWER is (a) True |
|
| 47. |
The specifications are written in a language so that they indicate what the work should be and words “shall be” or “should be” are used.(a) True(b) FalseThe question was asked in an internship interview.I need to ask this question from General Specifications in chapter Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» CORRECT option is (a) True The best explanation: The General Specification for Civil Engineering WORKS LAYS down the quality of materials, the standards of workmanship, the testing methods and the acceptance CRITERIA for civil engineering works undertaken for the government for a particular Region. Where NECESSARY, this General Specification should be supplemented by a particular specification. |
|
| 48. |
For first class building the foundation and plinth shall be of 1st class brickwork in lime mortar or 1:2 cement mortar over lime concrete or 1:6:7 cement concrete.(a) True(b) FalseThe question was asked in my homework.This key question is from General Specifications in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct option is (b) False |
|
| 49. |
During lime concreting in foundation the concrete shall consists of 10 cu m of brick ballast, 0.92 cu m of surkhi and 0.6 cu m of white lime in the proportion of 100:32:16 by volume.(a) True(b) FalseThis question was posed to me at a job interview.The question is from Detailed Specifications topic in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The correct answer is (b) False |
|
| 50. |
The type of transition curves generally provided on hill roads, is ________(a) lemniscate(b) cubic parabola(c) circular(d) spiralThe question was posed to me in semester exam.This intriguing question originated from Detailed Specifications of Road Work topic in section Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing |
|
Answer» The CORRECT CHOICE is (d) spiral |
|