For the construction of buildings, the subheads of...
1.
For the construction of buildings, the subheads of the estimate are
Answer»
All the above
Show Answer
Discussion
No Comment Found
Post Comment
Related InterviewSolutions
For the construction of buildings, the subheads of the estimate are
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies