1.

In rate monotonic scheduling, a process with a shorter period is assigned __________(a) a higher priority(b) a lower priority(c) higher & lower priority(d) none of the mentionedI had been asked this question in final exam.I'm obligated to ask this question of Real Time System in division Real Time Operating Systems(RTOS) of Operating System

Answer»

The CORRECT OPTION is (a) a HIGHER priority