51.

"revenue Posting Allowed For Old Orders"concerning The Indicator "revenue Posting Allowed": We Have Set The Indicator In The Order Type. it Is Copied From The Order Type When You Create New Orders.but The Orders That Already Exist Are Not Changed When We set This Indicator At A Later Date In The Order Type.we Have Old Orders And We Need To Use Dp90 For These Orders.is It Possible To Change This Rule?

Answer»

concerning The INDICATOR "REVENUE Posting Allowed": We Have Set The Indicator In The Order Type.

it Is Copied From The Order Type When You Create New Orders.

but The Orders That Already Exist Are Not CHANGED When We

set This Indicator At A Later DATE In The Order Type.

we Have Old Orders And We Need To Use Dp90 For These Orders.

is It Possible To Change This RULE?

The simple solution is to close the old orders, and re-create new ones.

The simple solution is to close the old orders, and re-create new ones.

52.

"automatic Warranty Dates Update During Equipment Creation" i Want To Update Warranty Dates While Creating The Serial Number And Equipment During Transaction Outbound Delivery. Can You Please Tell Me The User Exit For These?

Answer»

i Want To UPDATE Warranty Dates While Creating The Serial Number And EQUIPMENT During Transaction Outbound Delivery. Can You PLEASE TELL Me The User Exit For These?

Investigate user-exit IQSM0007 (Serial numbers, user exit for goods movements).

Investigate user-exit IQSM0007 (Serial numbers, user exit for goods movements).

53.

"master Data Changes In Fl /equi" i Have Several Related Questions About The Subject Matter: we Are Changing "location" Information In Master Data Of Fl And Equi. We Want Same Changes Reflected In The Old Notification And In The Order Of Change Objects. the Order Table By Direct Way Iaol Is Fl/equ Table. how Can We Accomplish This? How Do I Update Notification? what Will Be The Fate Of The Pmis Info Structures Data (s061 Etc), If I Update The Database Table Iloa Directly? i Also Want To Change The Notification/order Location Data Which Is Coming From Iloa Table (which Can Be Change In Fl/eq Directly). When I Am Changing Location Data In Fl, It's Reflected In Iloa Table But By Close Order/ Notification, It's Not Showing Updated Location.

Answer»

i Have Several Related Questions About The SUBJECT Matter:

the Order Table By Direct WAY Iaol Is Fl/equ Table.

how Can We Accomplish This? How Do I Update Notification?

Solutions are presented in the same number they were posed:

  1. The only nice way is through the cancellation of business completion and TECO. CHANGE the location, and then TECO, and business completion again.
  2. This can be done with a CATT. A disadvantage could be that the reference DATES has the work order or notification change.

    The quick and dirty solution is a direct update in table ILOA.

    Another way is to talk to your ABAP team about “direct database updates” on table ILOA.

  3. That will depend on the extent of PMIS usage. If you don’t use PMIS then it won’t matter.
  4. When you create an Order/Notification, the location data is automatically copied (once only) from the FLoc/Equi. This copy function does NOT occur automatically again.

Solutions are presented in the same number they were posed:

This can be done with a CATT. A disadvantage could be that the reference dates has the work order or notification change.

The quick and dirty solution is a direct update in table ILOA.

Another way is to talk to your ABAP team about “direct database updates” on table ILOA.

54.

"creating A Subordinate Functional Location Using Bapi" i'm Trying To Use Bapi_funcloc_create To Create A Subordinate Functional Location (ex., 1033-admi With Superior Functional Location 1033 Already Established). this Bapi Ends With A Blank/zero Return Value But No Updating Is Performed. how Do I Fix This Problem?

Answer»

i'm Trying To Use Bapi_funcloc_create To Create A SUBORDINATE FUNCTIONAL Location (ex., 1033-admi With Superior Functional Location 1033 Already Established).

this Bapi Ends With A Blank/zero Return Value But No Updating Is Performed.

how Do I Fix This Problem?

You need to perform a “commit” FUNCTION after the BAPI FINISHES.

You need to perform a “commit” function after the BAPI finishes.

55.

"the Combination Of Organizational Data Is Not Correct" i Am Working With Cs. When Using Iw51 To Create A Notification For A Customer I Get The Following Information Message: "the Combination Of Organizational Data Is Not Correct". the Message Number Is: Qm 054 no More Information Is Given. My Parameters In My Own Data Are The Same As Other Users And They Do Not Experience Any Problems With Iw51. the Customer Belongs To Sales Area 7000, Dist. Channel 10 And Division 10. But I Never Get That Far That I Can Choose A Customer. I Just Get An Initial Screen, While Others Go Directly Into The Notification. why Is This Happening And How Do I Resolve This?

Answer»

i Am Working With Cs. When USING Iw51 To Create A Notification For A Customer I Get The Following Information Message:

"the Combination Of Organizational Data Is Not Correct".

the Message Number Is: Qm 054

no More Information Is Given. My Parameters In My Own Data Are The Same As Other Users And They Do Not Experience Any PROBLEMS With Iw51.

the Customer BELONGS To Sales Area 7000, Dist. Channel 10 And Division 10. But I Never Get That Far That I Can Choose A Customer. I Just Get An Initial Screen, While Others Go Directly Into The Notification.

why Is This Happening And How Do I Resolve This?

no More Information Is Given. My Parameters In My Own Data Are The Same As Other Users And They Do Not Experience Any Problems With Iw51.

the Customer Belongs To Sales Area 7000, Dist. Channel 10 And Division 10. But I Never Get That Far That I Can Choose A Customer. I Just Get An Initial Screen, While Others Go Directly Into The Notification.

why Is This Happening And How Do I Resolve This?

I’m assuming you have entered equipment in the notification.

If so, ensure that the sale organization of the customer is the same as the sales organization in the equipment MASTER.

Verify if the customer belong to a sales area (sales order, dist channel, division).

Check this VIA TCode XD03.

I’m assuming you have entered equipment in the notification.

If so, ensure that the sale organization of the customer is the same as the sales organization in the equipment master.

Verify if the customer belong to a sales area (sales order, dist channel, division).

Check this via TCode XD03.

56.

"measuring Point" can I Maintain Two Different Units In A Measuring Point? for Example: i Entered All Readings In Amperes. Is It Possible To Maintain Readings In Volts At The Same Time? If So, How Do I Go About This?

Answer»

can I Maintain Two DIFFERENT Units In A Measuring POINT?

for Example:

i Entered All Readings In Amperes. Is It Possible To Maintain Readings In Volts At The Same Time? If So, How Do I Go About This?

You can have as many measurement points as you need.

You will need to create another measurement type (characteristic) to accommodate the other unit of measure.

Create a new measurement point with a new unit of measure and then LINK the new point with the old one using TRANSMISSION of measurement reading. This will resolve your problem.

You can have as many measurement points as you need.

You will need to create another measurement type (characteristic) to accommodate the other unit of measure.

Create a new measurement point with a new unit of measure and then link the new point with the old one using transmission of measurement reading. This will resolve your problem.

57.

"equipment Classification" i Have A Client That Wants To Have An Equipment Class Automatically Default To The Equipment Master During The Create Stage. The Client Also Requires That When The Equipment Is Either In Display Or Change To Display An Information Warning Message Prompting The User To Review The Classification And Its Associated Characteristics. i Have Checked The Configuration For Classification And Pm And Haven't Found Anything That Would Satisfy The Client's Requirements. This Appears Be A Custom Change To The Code. how Do I Fulfill All The Clients Requirements?

Answer»

i Have A Client That Wants To Have An Equipment Class Automatically DEFAULT To The Equipment Master During The Create Stage. The Client Also Requires That When The Equipment Is EITHER In Display Or Change To Display An Information Warning Message Prompting The User To REVIEW The Classification And Its Associated Characteristics.

i Have Checked The Configuration For Classification And Pm And Haven't FOUND Anything That Would Satisfy The Client's Requirements. This Appears Be A Custom Change To The Code.

how Do I Fulfill All The Clients Requirements?

You could create equipment with reference to another (SAY dummy master equipment).

Then utilize user-exit IEQM0003 (Additional checks before equipment update) to pop-up your warning message.

You could further investigate the following:

Use IEQM0003 to kick-off a batch program or workflow to re-enter the equipment (after initial save) and add data.

Create new event/method for business object EQUI (TCode SWO1).

You could create equipment with reference to another (say dummy master equipment).

Then utilize user-exit IEQM0003 (Additional checks before equipment update) to pop-up your warning message.

You could further investigate the following:

Use IEQM0003 to kick-off a batch program or workflow to re-enter the equipment (after initial save) and add data.

Create new event/method for business object EQUI (TCode SWO1).

58.

"equipment & Functional Local Class" i Would Like To Create One Class For Both Function, Location And Equipment And Then Call It Maintenance Objects. I Do Know That You Can Allow Multiple Objects In The Class Type. how Do I Set This Up?

Answer»

i Would Like To CREATE ONE Class For Both FUNCTION, Location And Equipment And Then Call It Maintenance Objects. I Do Know That You Can Allow Multiple Objects In The Class Type.

how Do I Set This Up?

You check in the IMG under Cross-Application Components -->CLASSIFICATION.

You check in the IMG under Cross-Application Components -->Classification.

59.

"contract With Several Different Billing Value Line Items" we Have Service Contracts With Customers Wherein We Would Like To Bill Them For The Actual Work Done Monthly Instead Of A Fixed Value (as Determined By The Monthly Plan). We Are Certain To Use Contracts Or Else I Could Have Used Time And Material To Bill Them. is There A Way To Force The Contract To Bill A Certain Value Monthly Based On The Actual Costs Collected On The Service Orders For That Month?

Answer»

we Have Service CONTRACTS With Customers Wherein We Would Like To Bill Them For The Actual WORK Done Monthly Instead Of A Fixed Value (as Determined By The Monthly Plan). We Are Certain To Use Contracts Or Else I Could Have Used Time And Material To Bill Them.

is There A Way To Force The Contract To Bill A Certain Value Monthly Based On The Actual Costs Collected On The Service ORDERS For That Month?

Try SETTLING all service order costs to the contract. After which, perform RRB on the contract itself (no BILLING plan required).

Try settling all service order costs to the contract. After which, perform RRB on the contract itself (no billing plan required).

60.

"access Control In Equipment Master" equipment Master Consists Of Several Tabs. It Is Possible To Restrict Access To Some Tabs When Visited In Change Mode. the Client Wants Some Tabs To Appear In A Display Mode And Some In Change Mode When Equipment Is Visited Through Ie02. how Do I Enforce This?

Answer»

equipment Master Consists Of Several Tabs. It Is Possible To Restrict ACCESS To Some Tabs When Visited In CHANGE Mode.

the Client WANTS Some Tabs To Appear In A Display Mode And Some In Change Mode When Equipment Is Visited Through Ie02.

how Do I ENFORCE This?

Try Transaction and Screen VARIANTS.

The T-CODE is SHD0

Try Transaction and Screen Variants.

The T-CODE is SHD0

61.

"default Equipment Category" there Is A Requirement To Default Equipment Category 'm' For Certain Users And 'p' For Some Other. In Configuration, Default Equipment Category Is Maintained As M. is There Any Way To Assign 'p' To Certain Users?

Answer»

there Is A Requirement To Default Equipment Category 'm' For CERTAIN Users And 'p' For Some Other. In Configuration, Default Equipment Category Is MAINTAINED As M.

is There Any Way To Assign 'p' To Certain Users?

You could set the USER’s Parameter ID (PID) for this.

Set PID = EQT for Equip Category, Value = P.

You could set the User’s Parameter ID (PID) for this.

Set PID = EQT for Equip Category, Value = P.

62.

"message While Completing Rma Order" when We Are Technically Completing The Service Order For Rma Processing (sm03 In Standard Sap), You Get A Message About The Status Of The Repair Materials. I Understand That The 'free To Be Delivered' Quantity Is Picked Up From Unrestricted Sales Order Stock And 'blocked' Quantity Is Picked Up From The Blocked Sales Order Stock. but How Is The Scrap Quantity Is Picked Up? is Possible To Issue The Service Material To The Order And Post Back The Repaired Material Into Stock?

Answer»

but How Is The Scrap QUANTITY Is Picked Up?

The process I follow for the scrap in RMA is as follows:

  1. Go to va02;
  2. Select the line item;
  3. Click repairs and mark scrap; The SYSTEM will then GIVE you a message saying “MANUAL inventory is POSTING”;
  4. Does TECo. System will give you a message: “Free-todelivery is 0 and scrapped is 1”.

Use 551 mvt Type.

The process I follow for the scrap in RMA is as follows:

Use 551 mvt Type.

63.

"issue Stock To Pm Order" what Is The Best Process To Issue Stock To An Order? for Example If An Order Needs The Stock Not To Be Detailed Within The Original Order, How Does The Store Clerk Add This Additional Stock To The Order? obviously, It Needs Accounting For And Has An Impact On Mrp. I Assume There Is A Quicker And Easier Way Of Adding It Without The Store Clerk Going To Change The Order, Adding The Stock, Then Going To Migo And Doing An Issue From Reservation Etc. is There A Way To Configure This To Be More Efficient?

Answer»

what Is The BEST Process To Issue Stock To An Order?

for Example If An Order Needs The Stock Not To Be Detailed WITHIN The Original Order, How Does The Store Clerk Add This Additional Stock To The Order?

obviously, It Needs Accounting For And Has An Impact On Mrp. I Assume There Is A Quicker And Easier Way Of Adding It Without The Store Clerk Going To CHANGE The Order, Adding The Stock, Then Going To Migo And Doing An Issue From Reservation Etc.

is There A Way To Configure This To Be More Efficient?

Check if it gives the hint of issuing the material which is not reserved in the WORK order.

Check if it gives the hint of issuing the material which is not reserved in the work order.

64.

"actual Variance Maintenance Plan" in Maintenance Plan We Get The Actual Variance (of Day) In "maintenance Plan Schedule Calls" Tab. as We Are Looking For The Number Of Days, The Plan Is Not Completed. question:can We Get Same Data In Any Other List Reports?

Answer»

in Maintenance Plan We Get The Actual Variance (of DAY) In "maintenance Plan Schedule CALLS" Tab.

as We Are Looking For The Number Of Days, The Plan Is Not Completed.

question:

can We Get Same Data In Any Other List Reports?

Assuming you mean the date difference between PLANNED and actual (confirmation date), this date can be FOUND in tables MHIS and respectively.

Assuming you mean the date difference between planned and actual (confirmation date), this date can be found in tables MHIS and respectively.

65.

"catalog Profile For Equipment" what Is The Process For Maintaining Catalog A Profile For Each Equipment? we Have A General Catalog Profile For All The Equipment. We Are Interested In Having A Display Of Catalogs For The Selected Equipment In Notifications. is It Possible To Maintain Catalog Profiles For Functional Locations?

Answer»

what Is The Process For MAINTAINING CATALOG A Profile For Each Equipment?

we Have A General Catalog Profile For All The Equipment. We Are Interested In Having A Display Of Catalogs For The Selected Equipment In Notifications.

is It Possible To Maintain Catalog Profiles For Functional Locations?

CREATE a catalog profile and ASSIGN it to your equipment in the Organization tab. This will then be copied to the Notification when the equipment number is entered.

The same works for Functional locations.

Create a catalog profile and assign it to your equipment in the Organization tab. This will then be copied to the Notification when the equipment number is entered.

The same works for Functional locations.

66.

"catalogs In Pm Order / Task List" what Is The Purpose Of Catalog Tab In Task List And Pm Order? i Find This In The Component Overview Of Orders And Task Lists. We Maintained Boms For Equipment. We Use Catalogs For Notification. how To Use Catalogs In The Component Overview Of Order? do We Need To Do Some Settings In Material Master?

Answer»

what Is The Purpose Of Catalog Tab In Task List And Pm Order?

i Find This In The Component Overview Of ORDERS And Task Lists. We Maintained Boms For Equipment. We Use CATALOGS For Notification.

how To Use Catalogs In The Component Overview Of Order?

do We Need To Do Some Settings In MATERIAL Master?

If you are referring to the Catalog button at the BOTTOM of the Components tab, then this is used to link to an internal/ external internet site where you can order spare parts.

Have a LOOK in the PM IMG for OCI (under orders).

If you are referring to the Catalog button at the bottom of the Components tab, then this is used to link to an internal/ external internet site where you can order spare parts.

Have a look in the PM IMG for OCI (under orders).

67.

"user Defined Fields In List Editing" when We Do Enhancement By Adding User Defined Fields In Notification Is It Possible To Select Notifications Based On User Defined Fields In List Editing Transaction?

Answer»

when We Do Enhancement By Adding User DEFINED Fields In Notification Is It Possible To Select Notifications BASED On User Defined Fields In List Editing Transaction?

My GUESS is that you will not be able to see the customer specific fields in the standard list edit PROGRAMS.

But you can simply COPY these programs and include the fields yourself.

My guess is that you will not be able to see the customer specific fields in the standard list edit programs.

But you can simply copy these programs and include the fields yourself.

68.

"identify Parts As Billable Or Non-billable" we Need To Identify Parts In The Service Order As Billable Or Non-billable. We Are Using The Accounting Indicator On The Header Of The Service Order To Identify Warranty Or Nonwarranty Repair. However, Entering The Accounting Indicator Here Applies To All Parts And Labor Confirmed And Issued To The Service Order. We Want To Be Able To Enter An Accounting Indicator Or Some Other Process Of Identifying Individual Parts As Billable Or Non-billable.

Answer»

we NEED To Identify Parts In The Service ORDER As Billable Or Non-billable. We Are Using The Accounting Indicator On The Header Of The Service Order To Identify Warranty Or Nonwarranty Repair. However, Entering The Accounting Indicator Here Applies To All Parts And Labor Confirmed And Issued To The Service Order. We Want To Be Able To Enter An Accounting Indicator Or Some Other Process Of IDENTIFYING INDIVIDUAL Parts As Billable Or Non-billable.

You can enter the accounting indicator in DP90 instead.

You can enter the accounting indicator in DP90 instead.

69.

"maintenance Plan User Status" i Can Create A Profile Available To Maintenance Plans. However, I Am Not Able To Allocate It.qestion: is It Possible To Assign A User Status To A Maintenance Plan?

Answer»

i Can CREATE A Profile Available To Maintenance Plans. However, I Am Not Able To Allocate It.

qestion:

is It Possible To Assign A User Status To A Maintenance PLAN?

In the 47 SYSTEM, you can assign the user-status to a maintenance plan.

PLEASE check ECC5 or ECC6 for verification of profile data.

In the 47 system, you can assign the user-status to a maintenance plan.

Please check ECC5 or ECC6 for verification of profile data.

70.

"accounting Indicator In Dp91" the Accounting Indicator Entered In The Header Of The Service Order Applies To All Labor And Parts Confirmed And Issued. We See The Accounting Indicator When We Do Dp91. If We Change The Accounting Indicator From Say 01 (billable) To 03 (warranty) This Transfers Into The Repair Order (seen On The Sales B Tab), But The Costs Still Post To 01.question Why Do The Costs Not Repost To The Correct Accounts Based On The Accounting Indicator In Dp91?

Answer»

the Accounting Indicator Entered In The Header Of The Service Order Applies To All Labor And Parts Confirmed And Issued. We SEE The Accounting Indicator When We Do Dp91. If We CHANGE The Accounting Indicator From Say 01 (billable) To 03 (warranty) This Transfers Into The Repair Order (seen On The Sales B TAB), But The Costs Still Post To 01.

question

Why Do The Costs Not REPOST To The Correct Accounts Based On The Accounting Indicator In Dp91?

Check your pricing procedure to see what account key (ActKy) is set for the condition type (the standard is KBM1). From there, you can proceed to correct any ERRORS.

Check your pricing procedure to see what account key (ActKy) is set for the condition type (the standard is KBM1). From there, you can proceed to correct any errors.

71.

"copy Of Functional Location" i Have A Requirement From A Client That He Wants To Copy The Functional Location With Its Equipment From One Plant To Another Plant If It Is Possible. question:if Yes, How Can I Accomplish This?

Answer»

i Have A Requirement From A Client That He Wants To Copy The Functional Location With Its Equipment From One Plant To Another Plant If It Is Possible.

question:

if Yes, How Can I Accomplish This?

  • Use a filter to display only what you need in the hierarchy;
  • From the hierarchy display, right mouse click on the NODE you need to copy;
  • From the CONTEXT options dialog, select ‘Copy sub hierarchy’;

TEST this thoroughly before using in your Production system as it is possible to CREATE part of your structure. If SAP encounters a problem with an OBJECT, the rest of the structure will not be created.

Test this thoroughly before using in your Production system as it is possible to create part of your structure. If SAP encounters a problem with an object, the rest of the structure will not be created.

72.

"deletion Flag For A Fl" even When We Have Set A Deletion Flag For A Functional Location, It Allows Us To Install Equipment In It. Our Requirement Is That The System Should Disallow It. question:is It A Standard Functionality Of Sap?

Answer»

EVEN When We Have Set A DELETION Flag For A Functional LOCATION, It ALLOWS Us To Install EQUIPMENT In It. Our Requirement Is That The System Should Disallow It.

question:

is It A Standard Functionality Of Sap?

question:

is It A Standard Functionality Of Sap?

question:

is It A Standard Functionality Of Sap?

Yes it is.

This could be blocked by using a user status

Yes it is.

This could be blocked by using a user status

73.

"maintenance Order-teco" i Have Created A Purchase Requisition Through A Maintenance Order By Using Non-stock Item Category. Later, I Decided That I Don't Want That Material For That Work. So I Ticked On Clear Reservation At The Time Of Confirmation In Iw42. When I Tried To Tech The Maintenance Order, I Am Getting The Following Error Message: "final Issue For The Reservation Item 0001 Is Not Completed, Teco Not Possible Message No. Me303" question:how Can I Do Tech Without The Need Of That Material? i Won't Create A Po Normally If I Do Clear Reservation At The Time Of Confirmation. Automatically, The System Will Delete The Pr. It's Happening In Ides. it Didn't Happen In Production Server (ecc 5.0) Though. how Can I Do Tech Without The Need Of That Material?

Answer»

i Have Created A Purchase Requisition Through A Maintenance Order By Using Non-stock Item Category. Later, I Decided That I Don't WANT That Material For That WORK. So I Ticked On Clear Reservation At The Time Of Confirmation In Iw42. When I Tried To Tech The Maintenance Order, I Am Getting The Following Error Message:

"final Issue For The Reservation Item 0001 Is Not Completed, TECO Not Possible Message No. Me303"

question:

how Can I Do Tech Without The Need Of That Material?

i Won't Create A Po NORMALLY If I Do Clear Reservation At The Time Of Confirmation. Automatically, The System Will Delete The Pr. It's Happening In Ides.

it Didn't Happen In Production SERVER (ecc 5.0) Though.

how Can I Do Tech Without The Need Of That Material?

"final Issue For The Reservation Item 0001 Is Not Completed, Teco Not Possible Message No. Me303"

question:

how Can I Do Tech Without The Need Of That Material?

i Won't Create A Po Normally If I Do Clear Reservation At The Time Of Confirmation. Automatically, The System Will Delete The Pr. It's Happening In Ides.

it Didn't Happen In Production Server (ecc 5.0) Though.

how Can I Do Tech Without The Need Of That Material?

"final Issue For The Reservation Item 0001 Is Not Completed, Teco Not Possible Message No. Me303"

question:

how Can I Do Tech Without The Need Of That Material?

i Won't Create A Po Normally If I Do Clear Reservation At The Time Of Confirmation. Automatically, The System Will Delete The Pr. It's Happening In Ides.

it Didn't Happen In Production Server (ecc 5.0) Though.

how Can I Do Tech Without The Need Of That Material?

It sounds very much like a User Exit (Enhancement) may be active in your system. The TECO User Exit to consider is: IWO10004.

Use Transaction CMOD so you can see if there is such an exit possible.

Drop down on the project field to search for a project associated with indicated exit. Search by “Information System” and at the bottom of the selection screen there is an Icon called “All Selections” [Shows a little + sign too].

Now once you have expanded the selection criteria insert the indicated User Exit Number in the “Enhancement” field. Execute and wait to see if there is a project associated with the exit at TECO. If there is one, select it and select the DISPLAY ICON.

Once the data is shown there is a “Project Status”. If this is “Active”, then you have an active exit on TECO.

I suggest you have an ABAPer look at the code associated in the “Include” of the exit.

I suspect there is code checking a flag on the Materials or something.

It sounds very much like a User Exit (Enhancement) may be active in your system. The TECO User Exit to consider is: IWO10004.

Use Transaction CMOD so you can see if there is such an exit possible.

Drop down on the project field to search for a project associated with indicated exit. Search by “Information System” and at the bottom of the selection screen there is an Icon called “All Selections” [Shows a little + sign too].

Now once you have expanded the selection criteria insert the indicated User Exit Number in the “Enhancement” field. Execute and wait to see if there is a project associated with the exit at TECO. If there is one, select it and select the DISPLAY ICON.

Once the data is shown there is a “Project Status”. If this is “Active”, then you have an active exit on TECO.

I suggest you have an ABAPer look at the code associated in the “Include” of the exit.

I suspect there is code checking a flag on the Materials or something.

74.

"copy Functional Location" i Need To Transfer The Fl And Eq. question:can We Copy A Functional Location With Its Equipments From One Plant To Another Plant? If So, Then What Do We Need In The Target Plant?

Answer»

i Need To Transfer The FL And Eq.

question:

can We Copy A Functional Location With Its Equipments From One Plant To Another Plant? If So, Then What Do We Need In The Target Plant?

You can copy the FLoc structure via TCode IL04; however you cannot copy the equipment.

At first, create in the customizing all the objects depending on planning and MAINTENANCE plant: Company AREA, planer group, and location.

Than, create the new work center, and cost center for the new plant.

Download, from the functional location, all the data depending on planning and the maintenance plant.

Do the same for the PIECES of equipment if they are not installed on functional location.

At the first level of the FL, change the maintenance plant. Normally, the system changes all the data on all the SUB level and EQ. Now you can reload on FL and/or EQ all the data depending on planning and maintenance plant.

You can copy the FLoc structure via TCode IL04; however you cannot copy the equipment.

At first, create in the customizing all the objects depending on planning and maintenance plant: Company area, planer group, and location.

Than, create the new work center, and cost center for the new plant.

Download, from the functional location, all the data depending on planning and the maintenance plant.

Do the same for the pieces of equipment if they are not installed on functional location.

At the first level of the FL, change the maintenance plant. Normally, the system changes all the data on all the sub level and EQ. Now you can reload on FL and/or EQ all the data depending on planning and maintenance plant.

75.

"date Used For Maintenance Plan Scheduling Using Shift Factor" i Need Some Confirmation Information On Maintenance Plan Scheduling. question:if You Are Using Maintenance Plan And Makes Use Of Shift Factors, What Date Is Used In The Adjustment Of The Maintenance Plan Which Is Considering Previous Order? is It The Teco Date On The Order Or Is It On The Confirmations Date? i Have Heard It Is On The First Confirmed Operation But Cannot Believe This, Unless It Is Adjusted With Every Sub-sequent Confirmation. i Do Not Have Access To A System Currently. Is There An Explanation On The Written Principle To Plan Adjustments When Using Shift Factors?

Answer»

i Need Some Confirmation Information On Maintenance Plan Scheduling.

question:

if You Are Using Maintenance Plan And Makes Use Of Shift Factors, What DATE Is Used In The Adjustment Of The Maintenance Plan Which Is Considering Previous Order?

is It The Teco Date On The Order Or Is It On The Confirmations Date?

i Have Heard It Is On The First Confirmed Operation But Cannot Believe This, UNLESS It Is Adjusted With Every Sub-sequent Confirmation.

i Do Not Have Access To A System Currently. Is There An Explanation On The Written Principle To Plan Adjustments When Using Shift Factors?

You know that really annoying pop-up box that appears when you TECO and order? The one with the reference date and time?

This is the information used as a BASIS for the shift factors.

In the newer versions, there are two reference dates and TIMES. One of them is specifically used for maintenance PLANS.

The new functionality is available from version 4.7 onwards. You need to activate this for each of the maintenance plan category.

You know that really annoying pop-up box that appears when you TECO and order? The one with the reference date and time?

This is the information used as a basis for the shift factors.

In the newer versions, there are two reference dates and times. One of them is specifically used for maintenance plans.

The new functionality is available from version 4.7 onwards. You need to activate this for each of the maintenance plan category.

76.

"regarding Call Horizon In The Maintenance Plan" if We Create A Maintenance Plan With Reference To A Package Which Has Different Cycles Say (weekly, Monthly, And Yearly). The Call Horizon Is Applied Based On The Least Frequency. question:if The Call Date Is Calculated As 3 Days Earlier For A Weekly Cycle, It Holds Good For The Monthly And Yearly Cycle. my Client Wants A Different Call Horizon For Each Cycle Defined In The Maintenance Package. is There Any Way To Configure It As Required By The Client?

Answer»

if We Create A Maintenance Plan With Reference To A Package Which Has Different Cycles Say (WEEKLY, Monthly, And Yearly). The Call Horizon Is Applied BASED On The Least Frequency.

question:

if The Call Date Is Calculated As 3 DAYS EARLIER For A Weekly Cycle, It HOLDS Good For The Monthly And Yearly Cycle.

my Client Wants A Different Call Horizon For Each Cycle Defined In The Maintenance Package.

is There Any Way To Configure It As Required By The Client?

This is standard functionality. You can utilize user-exits to change these values.

This is standard functionality. You can utilize user-exits to change these values.

77.

What Is Meant By Single Cycle Plan ?how It Works?

Answer»

SINGLE cycle plan is may be performance-based or time-based but here it not required to maintain strategy.By entering main. category we will create MEANT. plan for particular object by USING t-code IP41.

single cycle plan is may be performance-based or time-based but here it not required to maintain strategy.By entering main. category we will create meant. plan for particular object by using t-code IP41.

78.

How To Set The Deletion Flag To Functional Location And Also Want To Know How To Hide The Flagged Functional Location?

Answer»

You can use transaction code IL02 to change FUNCTIONAL location, highlight the respective functional location and go to edit at the top tool BAR, their you select functions change and their you can CLICK DELETE, to set a flag delete.

You cannot hide this functional location when you display IH01 , the functional location hierarchy is displayed but once you click it , the screen appears showing the functional location is created with flag for deletion.

You can use transaction code IL02 to change functional location, highlight the respective functional location and go to edit at the top tool bar, their you select functions change and their you can click delete, to set a flag delete.

You cannot hide this functional location when you display IH01 , the functional location hierarchy is displayed but once you click it , the screen appears showing the functional location is created with flag for deletion.

79.

How To Schedule Counter Base Maintenance Plant For Dg In Power Plant That Need 800hr Per Month Mains This Steps I Followed. i Have Created Meas Pt With Counter (ik01) Created Meas Document Ik11 Then Schedule Thru Ip10.but Not Getting Due Order List In Ip24

Answer»

i Have CREATED Meas Pt With Counter (ik01) Created Meas Document Ik11 Then SCHEDULE Thru Ip10.but Not Getting DUE Order List In Ip24

First of all, you cannot get 800 hrs per month...

For counter based... it will schedule in two DAYS... like.. days and hours... but.. if U schedule in IP10..it will take the annual reading and schedule the dates.. So.. if the running hrs didn't reach, but the date reached... so.. it will open a order...

Give the annual reading according to the running hrs of the DG.. then u will get.

First of all, you cannot get 800 hrs per month...

For counter based... it will schedule in two days... like.. days and hours... but.. if u schedule in IP10..it will take the annual reading and schedule the dates.. So.. if the running hrs didn't reach, but the date reached... so.. it will open a order...

Give the annual reading according to the running hrs of the DG.. then u will get.

80.

What Is Work Center Category?

Answer»

Basically work center category decides the CAPACITY (means ability to do work). The category defines the activity type for costing and scheduling the categories MAINLY we come ac-cross in the production are labor and machine. Hence to define labor cost, machine cost and setup cost we define work center category to create work center and we enter defaults THEREIN. For a period of time if there are no much CHANGES we generally prefer production line, and if there are much changes in the production we prefer activity type for individual ORDER which we call production order. By this you can understand cat type 001 for machine and cat type for labor.

Work center category used to define which screen selection & field selection for a particular work center.

Basically work center category decides the capacity (means ability to do work). The category defines the activity type for costing and scheduling the categories mainly we come ac-cross in the production are labor and machine. Hence to define labor cost, machine cost and setup cost we define work center category to create work center and we enter defaults therein. For a period of time if there are no much changes we generally prefer production line, and if there are much changes in the production we prefer activity type for individual order which we call production order. By this you can understand cat type 001 for machine and cat type for labor.

Work center category used to define which screen selection & field selection for a particular work center.

81.

What Is A Milestone Confirmation?

Answer»

The milestone confirmation is a special form of confirmation, in which the confirmation of one operation CAUSES other OPERATIONS or SUB operations to be automatically confirmed at the same time.

Milestones are operations that have the corresponding indicator in the control key.Operations can be defined as milestone operations in their control keys. If a milestone operation is confirmed, then PREVIOUS operations are automatically confirmed.

The milestone confirmation is a special form of confirmation, in which the confirmation of one operation causes other operations or sub operations to be automatically confirmed at the same time.

Milestones are operations that have the corresponding indicator in the control key.Operations can be defined as milestone operations in their control keys. If a milestone operation is confirmed, then previous operations are automatically confirmed.

82.

How Can We Assign Measuring Points To A Strategy Plan Like Compressor Running Hrs?

Answer»

Go to the CHANGE EQUIPMENT transaction , then extra, then add or replace counters. then SELECT the desired counter by F4 help. you can't DIRECTLY add counters or measuring PTS to a maintenance plan.

u can do this for equipment , FL and PRT only.

Go to the change equipment transaction , then extra, then add or replace counters. then select the desired counter by F4 help. you can't directly add counters or measuring pts to a maintenance plan.

u can do this for equipment , FL and PRT only.

83.

How To Add The Counter Plan And Strategy Plan In A Single Maintenance Plan?

Answer»

MULTIPLE counter plan and strategy plan cannot be added together, If u ADD counter plan with a strategy, counter plan will be taken into CONSIDERATION ,strategy will not be considered.

multiple counter plan and strategy plan cannot be added together, If u add counter plan with a strategy, counter plan will be taken into consideration ,strategy will not be considered.

84.

What Are The Common Pm Interview Questions?

Answer»
  1. What about class & characteristics is it also the same thing
  2. counter is triggers order when particular VALUE set comes ,so is it POSSIBLE to trigger it on alpha bet INSTEAD of digit REFERENCE for any type of counting . i.e. Is it possible to count alpha bet instead of digit?
  3. When I SEARCH that t code on sap forum It will show for sub order .So when & why we create sub order
  4. What is significance of T code iw36.
  5. In IMG settings, Maintain the Value category for Internal labor cost, and assigned to appreciate cost elements group.

85.

What Is Refurbishment Order? Explain The Total Cycle?

Answer»

Refurbishment order is used for up GRADATION of DAMAGED /DEFECTIVE spare parts and are segregated as CONDITION based . eg C1, C2 and C3.

CYCLE:

create refurbishment order- withdrawal of spare parts from store- refurbishment execution- order completion CONFIRMATION- refurbished parts back to store- goods receipt for returning.

Refurbishment order is used for up gradation of damaged /defective spare parts and are segregated as condition based . eg C1, C2 and C3.

CYCLE:

create refurbishment order- withdrawal of spare parts from store- refurbishment execution- order completion confirmation- refurbished parts back to store- goods receipt for returning.

86.

What Is The Use Of Item Number In Maintenance Order?

Answer»

 Item number refers to the number (not MATERIAL number) to IDENTIFY the material COMPONENT that is to be used for an operation in the maintenance ORDER.It is generally given in increments of 0010.It is the first field in the COMPONENTS tab of a maintenance order.

 Item number refers to the number (not material number) to identify the material component that is to be used for an operation in the maintenance order.It is generally given in increments of 0010.It is the first field in the Components tab of a maintenance order.