1.

What Are The Costing Parameter?

Answer»

The costing Parameters are the following

Work center : Activity types and the formulaes, cost center

ROUTING : the time ,activity types

In PRODUCTION order dependent parameters we are defining the Variant, result ANALYSIS key, settlement profile In the controlling i.e in KP 26 we will be defining the rates PER hour depending on the rates it will reflect the cost calculating from the routing.

The costing Parameters are the following

Work center : Activity types and the formulaes, cost center

Routing : the time ,activity types

In Production order dependent parameters we are defining the Variant, result analysis key, settlement profile In the controlling i.e in KP 26 we will be defining the rates per hour depending on the rates it will reflect the cost calculating from the routing.

2.

What Is The Difference Between Stock Transfer Order And Stock Transport Order?

Answer»

Stock transfer is the transfer of stock for the usage in the same COMPANY WHEREAS stock transport is MEANT for change of TITLE of stock in the name of the buyer.

Stock transfer is the transfer of stock for the usage in the same company whereas stock transport is meant for change of title of stock in the name of the buyer.

3.

Tell Me The Planning Steps For 100 Products?

Answer»

CK11n is USED for standard COST ESTIMATION. to run that we have to run ck24 ALSO. Use CK40N f0r 100 products

CK11n is used for standard cost estimation. to run that we have to run ck24 also. Use CK40N f0r 100 products

4.

What We Will Do After The Marking And Releasing Of Standard Price In Product Costing?

Answer»

PRICE update and the same reflects in the ACCOUNTING view of the MATERIAL MASTER.

Price update and the same reflects in the accounting view of the material master.

5.

Do You Have Several Alternative Boms For A Material, Depending On The Manufacturing Procedure Or Lot Size, For Example (multiple Bom)?

Answer»

yes you can have several alternative BOMs for a MATERIAL, only THING is you NEED to DEFINE EVERY BOM with deiffrent product structure type.

yes you can have several alternative BOMs for a material, only thing is you need to define every BOM with deiffrent product structure type.

6.

Do You Have Products With A Large Number Of Variants? Do You Need Variant Configuration?

Answer»

We can have any NUMBER of varaint product. It is optional you can configurate it or at the timne of slaes order with will be ASK for features and OPTIONS. Every varraint has UNIQUE indentificatin number.

We can have any number of varaint product. It is optional you can configurate it or at the timne of slaes order with will be ask for features and options. Every varraint has unique indentificatin number.

7.

Which Bom Maintenance Functions Do You Require (copy Functions, Mass Changes, And So On)?

Answer»

CS20 with this transaction code we can able to do Mass changes to BOM such as:

  • Change ITEM Data
  • New material
  • NUMBER of the material that is to be created or that is to
  • replace another material.
  • Dependencies
  • You can only replace a material with another material that
  • has the same values in the following fields:
  • base UNIT of measure
  • issue unit
  • material TYPE

CS20 with this transaction code we can able to do Mass changes to BOM such as:

8.

What Structure Do Your Boms Have? How Many Levels Are There? How Many Components Are There On Each Level?

Answer»
  • BOM IS A MULTILEVEL,
  • we can assign bom level by level cs11,
  • level 1 bom header material ASSEMBLY level,

CONTAINS COMPONENTS which also have bom contains

  • level 2 bom sub assembly level
  • LAST lower level is
  • level 3 components level

contains components which also have bom contains

9.

Do You Have Different Boms For A Material In Different Plants?

Answer»

generally we have FOLLOWING BOMs0

  1. Product Tree
  2. Parent- component relationship
  3. MULTILEVEL Bill
  4. Multiple Bill
  5. Single Level Bill
  6. Indented bill
  7. SUMMARIZED parts list
  8. Planning bill
  9. where- USED report
  10. Pegging report

 

generally we have following BOMs0

 

10.

In Which Context Do You Use Bills Of Material?

Answer»

[ ] Material Requirements Planning
[ ] EXECUTE Production
[ ] Goods Movements (to Help DATA Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] OTHERS?

Product Costing :in order to observe the different CYCLE times on the particular product in the bom,for the process CAPABILITY&for the costing of that particular product

[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others?

Product Costing :in order to observe the different cycle times on the particular product in the bom,for the process capability&for the costing of that particular product

11.

What Are All The Different Manufacturing Scenarios In Pp?

Answer»

There are DIFFERENT scenarios in SAP PP module.

  1. Make to stock
  2. Make to order
  3. External PROCESSING (Subcontracting)
  4. REWORK processing
  5. Prodcution in ANOTHER PLANT

There are different scenarios in SAP PP module.

12.

Explain What Is The Meaning Of Exploding A Bom?

Answer»

it is the process of multiplying the requirement by the USAGE QUANTITY and RECORDING the appropriate requirements throughout the product tree

it is the process of multiplying the requirement by the usage quantity and recording the appropriate requirements throughout the product tree

13.

Explain Why There Is Need Of Production Version?

Answer»

In production version, we assign the BOM and ROUTING combination. And in CASE of alternate BOMs , it CLEARS which alternative bom has to be SELECTED automatically.

In production version, we assign the BOM and ROUTING combination. And in case of alternate BOMs , it clears which alternative bom has to be selected automatically.

14.

If There Are Some Errors In Goods Movements, And Less Stock Of Material Consumed, How Can We Solve That Problem In Sap?

Answer»

FIRST you have to do REVOKE Teco and then PROCESS the order, OTHERWISE SYSTEM won’t allow.

First you have to do revoke Teco and then process the order, otherwise system won’t allow.

15.

If There Are Some Errors In Goods Movements, And Less Stock Of Material Consumed, How Can I Solve That Problem In Sap?

Answer»

According to me COGI is BASICALLY a SAP standardised system which will tell you that what is the error in some CASES it can rectify it too.

But if the entry is DONE manually by MB1A, MB1B, MB1C you have to bring back or cancell the ovement or MOVE the stock to desired MATERIAL and then refresh COGI.

According to me COGI is basically a SAP standardised system which will tell you that what is the error in some cases it can rectify it too.

But if the entry is done manually by MB1A, MB1B, MB1C you have to bring back or cancell the ovement or move the stock to desired material and then refresh COGI.

16.

Can We Create Production Order Without Bom And Routing?

Answer»

yes we can create a production order without BOM & routing.Change the Config in OPL8 ( order type dependent parameters)as routing OPTIONAL. But it MAY ASK for a sales order when we try to create order using CO01

yes we can create a production order without BOM & routing.Change the Config in OPL8 ( order type dependent parameters)as routing optional. But it may ask for a sales order when we try to create order using CO01

17.

How To Delete A Group Of Products That Was Created In Screen Mc84 ?

Answer»

DELETE the members in the PRODUCT group and then ARCHIVE the product group in transaction SARA, object=MM_MATNR. (The product group is created as a material master record with material type PROD and this record is deleted in SARA.)

Delete the members in the product group and then archive the product group in transaction SARA, object=MM_MATNR. (The product group is created as a material master record with material type PROD and this record is deleted in SARA.)

18.

What Is The Output Of Mps Run ?

Answer»

From MPS run you plan the materials which are of 'A' type in the abs analysis (80% dollar value) that have to be planned before hand. MPS is also a type of MRP only in which components just below the materials on which MPS run is taken place, are planned.

Table for production order STATUS - What is the table for finding status (for Ex TECO end prod orders). We are not able to FIND from AFKO and AFRU tables the status of production orders or at least the link tables if known can be mentioned. You are unable to link the STRUCTURE cuffed and IOHEADER WITH AFKO and AFRU. JEST is the table.

Data dictionary table for SOP planning data - You are USING Standard SOP (Info structure S076), in which table can you see the planning values that you maintained in MC93 transaction? You looked under table "S076" and did not see any values there. Use Tcode MC95 to display your entries under the version which maintained the table S076.

Production order operation's component allocation - How does SAP know that an operation has components as indicated by the component allocation indicator? Tcode CO08. Component allocation is done VIA routing maintenance or BOM maintenance for the assembly. This is master data maintenance. As soon as a PO is created, the master data is read into the PO.

From MPS run you plan the materials which are of 'A' type in the abs analysis (80% dollar value) that have to be planned before hand. MPS is also a type of MRP only in which components just below the materials on which MPS run is taken place, are planned.

Table for production order status - What is the table for finding status (for Ex TECO end prod orders). We are not able to find from AFKO and AFRU tables the status of production orders or at least the link tables if known can be mentioned. You are unable to link the structure cuffed and IOHEADER WITH AFKO and AFRU. JEST is the table.

Data dictionary table for SOP planning data - You are using Standard SOP (Info structure S076), in which table can you see the planning values that you maintained in MC93 transaction? You looked under table "S076" and did not see any values there. Use Tcode MC95 to display your entries under the version which maintained the table S076.

Production order operation's component allocation - How does SAP know that an operation has components as indicated by the component allocation indicator? Tcode CO08. Component allocation is done via routing maintenance or BOM maintenance for the assembly. This is master data maintenance. As soon as a PO is created, the master data is read into the PO.

19.

Scheduling Planned Order - How Can You Get Planned Orders Scheduled So That You Can Do Capacity Leveling ?

Answer»

MD11 and then Schedule works fine but ideally you would want the planned order scheduled automatically on CREATION? You have tried setting up an action to schedule the orders but cannot get that to work either.

When running MRP, try selecting "2" in the scheduling box this will bring planned orders into CM01 and CM21 Capacity planning CM01 - When you run capacity planning T-code:

CM01, you found the plan orders are not included in the pegged REQUIREMENT, you CHECKED the profile, the check box for order and plan order are all active. Guess that planned orders have been created without capacity requirement indicator in MRP ("2" - Lead Time scheduling), if this is the case, then when converted to PROCESS orders they will have impact on the Resource.

If you want to see them as planned orders, re-run the MRP or change in every planned order, going to the Menu:

Edit --> Scheduling Another couple of possibilities are to do with the routing/work centers used and WHETHER it is actually calculates consumption of capacity of the category at the work centre being displayed in CM01 (it might consume a capacity pool or it might not consume the category). MPS in Background/Online - You want to run MPS for a plant either online or in the background, but you do not get any results. If you run MPS for a single material/plant, then everything is 100% OK. You need to run a planning file and a consistency check first, transaction OMDO and MDRE respectively you'll need to set up two jobs to do it but it is straight forward, once you've done this set up the background job for MPS to run and do it in NEUPL first time round and then change to NETCH after that.

MD11 and then Schedule works fine but ideally you would want the planned order scheduled automatically on creation? You have tried setting up an action to schedule the orders but cannot get that to work either.

When running MRP, try selecting "2" in the scheduling box this will bring planned orders into CM01 and CM21 Capacity planning CM01 - When you run capacity planning T-code:

CM01, you found the plan orders are not included in the pegged requirement, you checked the profile, the check box for order and plan order are all active. Guess that planned orders have been created without capacity requirement indicator in MRP ("2" - Lead Time scheduling), if this is the case, then when converted to process orders they will have impact on the Resource.

If you want to see them as planned orders, re-run the MRP or change in every planned order, going to the Menu:

Edit --> Scheduling Another couple of possibilities are to do with the routing/work centers used and whether it is actually calculates consumption of capacity of the category at the work centre being displayed in CM01 (it might consume a capacity pool or it might not consume the category). MPS in Background/Online - You want to run MPS for a plant either online or in the background, but you do not get any results. If you run MPS for a single material/plant, then everything is 100% OK. You need to run a planning file and a consistency check first, transaction OMDO and MDRE respectively you'll need to set up two jobs to do it but it is straight forward, once you've done this set up the background job for MPS to run and do it in NEUPL first time round and then change to NETCH after that.

20.

Are There Any Reports In Sap To List Of Material Requirement From Ltp ?

Answer»

You NEED a list of MATERIAL requirement from LONG term planning result for each ITEM. Use MS70 then use MCEC.

You need a list of material requirement from long term planning result for each item. Use MS70 then use MCEC.

21.

How To Attach A Drawing For A Material To Bom ? Is It Possible ?

Answer»

Yes, you can attach a drawing. First create a document USING Transaction Code "CV01N - Create Document". Attach your drawing in that document. The system will GENERATE a document number. Assign this document in the BOM with item CATEGORY D. Report in LONG Term Planning - You use long term planning for your CUSTOMERS, what they need are very simple, just to calculate future requirements for 1 or 2 years.

Yes, you can attach a drawing. First create a document using Transaction Code "CV01N - Create Document". Attach your drawing in that document. The system will generate a document number. Assign this document in the BOM with item category D. Report in Long Term Planning - You use long term planning for your customers, what they need are very simple, just to calculate future requirements for 1 or 2 years.

22.

What Happens To Planned After It Has Been Converted Into Production Order ?

Answer»

When you CONVERT Planned ORDER to PRODUCTION order. the planned order are offset by production order. Reference of planned order can be SEEN in the production order.

When you convert Planned order to Production order. the planned order are offset by production order. Reference of planned order can be seen in the production order.

23.

What Are The Customer Activities Followed For Pp Module ?

Answer»

PP - Discrete Manufacturing.

Production Planning / Master data: For Production planning, only master data SHALL be migrated to SAP. In the 1st STAGE, there is no master data.

Following is the master data elements relevant for PP:

- Bill of materials - Routing. - Work Centres.

Transaction data: As of the cut off date, IDEALLY there should not be any work in process. All the open production orders should be closed and semi finished goods should be dismantled and should be added to Raw materials. This STRATEGY should be followed for all production orders where lead time to complete the production ORDER is not large. Since, the production orders are for longer duration and it is not possible to dismantle the product and add it to inventory, following can be the strategy for migrating the data to SAP:

  • Create a material master for the work in process and set the standard price as the cost incurred for that product (ie. Work in process)
  • Create a bill of material (which will be used only for this production order) including this material and other materials still to be consumed.
  • Create Routing for rest of the production process.
  • Bring the work in process material into inventory as of the cut off date.
  • Create the production orders in SAP for the Work in process and issue materials to production order. Complete the production process after the cutoff date of the project.

PP - Discrete Manufacturing.

Production Planning / Master data: For Production planning, only master data shall be migrated to SAP. In the 1st Stage, there is no master data.

Following is the master data elements relevant for PP:

- Bill of materials - Routing. - Work Centres.

Transaction data: As of the cut off date, ideally there should not be any work in process. All the open production orders should be closed and semi finished goods should be dismantled and should be added to Raw materials. This strategy should be followed for all production orders where lead time to complete the production order is not large. Since, the production orders are for longer duration and it is not possible to dismantle the product and add it to inventory, following can be the strategy for migrating the data to SAP:

24.

If There Are Some Errors In Goods Movements, And Less Stock Of Material Consumed, How Can We Solve That Problem In Sap ?

Answer»

FIRST you have to do revoke TECO and then process the order, otherwise SYSTEM won't ALLOW.

First you have to do revoke Teco and then process the order, otherwise system won't allow.

25.

If There Are Some Errors In Goods Movements, And Less Stock Of Material Consumed, How Can I Solve That Problem In Sap ?

Answer»

ACCORDING to me COGI is BASICALLY a SAP standardized system which will tell you that what is the ERROR in some cases it can rectify it too. But if the entry is done manually by MB1A, MB1B, MB1C you have to bring back or cancel the movement or MOVE the stock to desired material and then refresh COGI.

According to me COGI is basically a SAP standardized system which will tell you that what is the error in some cases it can rectify it too. But if the entry is done manually by MB1A, MB1B, MB1C you have to bring back or cancel the movement or move the stock to desired material and then refresh COGI.

26.

What Is The Difference Between Pp And Pp-pi? Which One Is Better And How ?

Answer»
  •  PP--> Production PLANNING mostly used for discrete type of industries, where at the time of confirmation the output is sure to be fixed.
  • eg AUTOMOBILE

  • PP- PI--> Production Planning for Process Industries , here mostly used for the typical chemical industries , as the Yield is not fixed due to chemical reaction yield values can be varied to NOTICEABLE EXTENT.
  • Eg X+Y =Z some 10 kg of X and 1 KG of Y gives yield that is Z of 10 Kg only.

eg Automobile

Eg X+Y =Z some 10 kg of X and 1 KG of Y gives yield that is Z of 10 Kg only.

27.

Can We Create Production Order Without Bom And Routing ?

Answer»

YES we can CREATE a production order without BOM & routing. Change the Config in OPL8 (order type dependent parameters) as routing optional. But it may ASK for a sales order when we try to create order using CO01

yes we can create a production order without BOM & routing. Change the Config in OPL8 (order type dependent parameters) as routing optional. But it may ask for a sales order when we try to create order using CO01

28.

Can Any Body Explain Me Why Work Scheduling View Is Required For Semi Finished And Finished Products?

Answer»

We NEED to maintain working scheduling view in order to MAKE that finished or semi finished goods available for PRODUCTION as we assign production scheduler and production scheduler PROFILE in this view, if not maintained conversion of planned order to production will not be POSSIBLE.

We need to maintain working scheduling view in order to make that finished or semi finished goods available for production as we assign production scheduler and production scheduler profile in this view, if not maintained conversion of planned order to production will not be possible.

29.

How To Create Opbject Dependencies In A Bom For A Configurable Material?

Answer»

Go to Extras -> Object Dependency -> ASSIGN

For this U need to create CHARACTERISTICS and CLASS (of Class Type 300) EARLIER

Go to Extras -> Object Dependency -> Assign

For this U need to create Characteristics and Class (of Class Type 300) earlier

30.

How The Process Time Is Calculated In A Wc When Both Labour, Machine Categories Exist?

Answer»

Scheduling is done BASED on the Capacity CATEGORY we define in the Work CENTER.

Scheduling is done based on the Capacity Category we define in the Work center.

31.

Where We Have To Specify The Teardown Time In One Operation?

Answer»

TEARDOWN time can be DEFINED as ONE of the Standard Parameters.

Teardown time can be defined as one of the Standard Parameters.

32.

How To Insert An Inspection Checkpoint At The End Of An Operation?

Answer»

If in process SAMPLE is to be defined, assign inspection type 03 in the Material Master.

Then CREATE MICs and assign them in the Routings.

System AUTOMATICALLY GENERATES the Inspection Lots

If in process sample is to be defined, assign inspection type 03 in the Material Master.

Then create MICs and assign them in the Routings.

System automatically generates the Inspection Lots

33.

Can't One Material Be Assigned To More Than One Operation In A Routing?

Answer»

ONE material from a BOM CANNOT be assigned to different OPERATIONS. It can be DONE by defining the material for so many TIMES as required in the BOM

One material from a BOM CANNOT be assigned to different Operations. It can be done by defining the material for so many times as required in the BOM

34.

How Requiements( Pir,sles Order, Customer Requirement) Are Reduced After They Are Produced?

Answer»

Reqmts are reduced automatically after Delivery is made to the Particular Order (In CASE of STRATEGY 11, the PIRS are CONSUMED after the GR for Production Order)

Reqmts are reduced automatically after Delivery is made to the Particular Order (In case of Strategy 11, the PIRs are consumed after the GR for Production Order)

35.

Can Mrp Be Carried Out For One Particular Level Of A Bom ( Level Code : 0001/0002 Etc)?

Answer»

YES it can be DONE by running for specific materials (SINGLE Material Single LEVEL).

Yes it can be done by running for specific materials (Single Material Single Level).

36.

In Lsmw Which Is Most Important Step?

Answer»

Maintain Object ATTRIBUTES
Maintain Source Structures
Maintain Source Fields
Maintain STRUCTURE Relations
Maintain Field MAPPING and Conversion RULES
Maintain Fixed VALUES, Translations, User-Defined Routines.

Maintain Object Attributes
Maintain Source Structures
Maintain Source Fields
Maintain Structure Relations
Maintain Field Mapping and Conversion Rules
Maintain Fixed Values, Translations, User-Defined Routines.

37.

How To Move To The Realization Phase?

Answer»

You MUST have some BLUEPRINTS to GO in NEXT PHASE.

You must have some blueprints to go in next phase.

38.

What Do We Do In Realization Phase?

Answer»

Provide ARICEF, CONFIGURATION Documents, integration test, BPP, UAT, UNIT Test and implements some SAP notes.

Provide ARICEF, Configuration Documents, integration test, BPP, UAT, Unit Test and implements some SAP notes.

39.

After Doing Realization How We Will Check Whether It Is Working Or Not?

Answer»

Doing Final preparation to CHECK USING the TEST case from USER.

Doing Final preparation to check using the test case from user.

40.

What Are Gaps? Some Examples?

Answer»

The GAPS are some issue in blue print that SAP cannot CAPTURE or prividing the CLIENT bussiness process.

The GAPS are some issue in blue print that SAP cannot capture or prividing the client bussiness process.

41.

How You Get The Ticket?

Answer»

After RELEASE ORDER,the RESERVATION will provide the ticke to PICK PRODUCTION material.

After release order,the reservation will provide the ticke to pick production material.

42.

In Project The Customization Is Comes Under Which Phase?

Answer»

Realization.

Realization.

43.

What Is Meaning Of Customized Reports?

Answer»

The REPORT which is not USING SAP STANDARD REPORTS.

The report which is not using SAP standard reports.

44.

What Is Costing? How It Is Affected The Pp?

Answer»

Determining the material costs of a product:

When you calculate production costs using a quantity STRUCTURE, the system automatically determines the BOM and all the BOM items that are RELEVANT to COSTING, in order to calculate MANUFACTURING costs.

Determining the material costs of a product:

When you calculate production costs using a quantity structure, the system automatically determines the BOM and all the BOM items that are relevant to costing, in order to calculate manufacturing costs.

45.

What Is Group Bom?

Answer»

Alphanumeric character string used to UNIQUELY identify a BOM.

Use:

If you assign a "MEANINGFUL" number to a BOM group, this gives you an additional way of accessing the BOM.

The system stores the following under a BOM group:

Alphanumeric character string used to uniquely identify a BOM.

Use:

If you assign a "meaningful" number to a BOM group, this gives you an additional way of accessing the BOM.

The system stores the following under a BOM group:

46.

What Is Planning Horizon?

Answer»

In this STEP, you DEFINE the planning horizon. This planning horizon SPECIFIES the period for the "Net change planning in the planning horizon".

In this kind of net change planning, only those materials that have undergone a change that is RELEVANT to MRP within the planning horizon are included in the planning run. Such materials receive a net change planning indicator in the planning FILE.

You make this specification for a plant. You can define an alternative planning horizon for MRP groups.

In this step, you define the planning horizon. This planning horizon specifies the period for the "Net change planning in the planning horizon".

In this kind of net change planning, only those materials that have undergone a change that is relevant to MRP within the planning horizon are included in the planning run. Such materials receive a net change planning indicator in the planning file.

You make this specification for a plant. You can define an alternative planning horizon for MRP groups.

47.

What Is Planning Time Fence?

Answer»

The planning TIME FENCE specifies a period within which no automatic changes are to be made to the master PLAN.

The planning time fence is MAINTAINED in WORKDAYS.

The planning time fence specifies a period within which no automatic changes are to be made to the master plan.

The planning time fence is maintained in workdays.

48.

What Are Basic Dates?

Answer»

Earliest date for the execution of the production order. This date TAKES into account the FLOAT before production.

If, on order creation, a planned order exists for the production order or process order, then the order dates are taken from the planned order. When scheduling the production order the system tries to adhere to the order dates (if necessary, with reduction measures).

If it is not possible to adhere to the basic dates and if the control parameter in Customizing allows the basic dates to be ADJUSTED, the system adjusts the basic dates of the order during the scheduling run. If the control parameter in Customizing does not allow the basic dates to be adjusted, the order keeps the basic dates of the planned order.

If the production order is created manually, you must enter at LEAST one order date manually. The scheduling TYPE determines, which order dates you must enter.

Earliest date for the execution of the production order. This date takes into account the float before production.

If, on order creation, a planned order exists for the production order or process order, then the order dates are taken from the planned order. When scheduling the production order the system tries to adhere to the order dates (if necessary, with reduction measures).

If it is not possible to adhere to the basic dates and if the control parameter in Customizing allows the basic dates to be adjusted, the system adjusts the basic dates of the order during the scheduling run. If the control parameter in Customizing does not allow the basic dates to be adjusted, the order keeps the basic dates of the planned order.

If the production order is created manually, you must enter at least one order date manually. The scheduling type determines, which order dates you must enter.

49.

What Is Sla ? Service Level Agreements?

Answer»

Service Level Agreements (SLA) define the ATTRIBUTES for service PRODUCTS (for example, maintenance, Hotline) that have been agreed upon with the CUSTOMER in service contracts. The SLA confirms DIFFERENT parameters, such as RESPONSE time, availability time and system availability.

Service Level Agreements (SLA) define the attributes for service products (for example, maintenance, Hotline) that have been agreed upon with the customer in service contracts. The SLA confirms different parameters, such as response time, availability time and system availability.

50.

What Is Opening Period?

Answer»

Opening period

The opening period represents the number of WORKDAYS that are subtracted from the order start date in order to determine the order CREATION date. This time is used by the MRP controller as a float for CONVERTING PLANNED orders into purchase REQUISITIONS or into production orders.

Opening period

The opening period represents the number of workdays that are subtracted from the order start date in order to determine the order creation date. This time is used by the MRP controller as a float for converting planned orders into purchase requisitions or into production orders.