For 10 cu m brickwork in 1:6 cement mortar, calculate the quantity of cement?(a) 0.20 cu m(b) 0.13 cu m(c) 0.56 cu m(d) 0.43 cu mThis question was addressed to me in a national level competition.My doubt is from Analysis of Rates of Cement Concrete in portion Analysis of Rates of Civil Engineering Drawing |
|
Answer» Right choice is (d) 0.43 cu m |
|