InterviewSolution
Saved Bookmarks
| 1. |
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is ________(a) 0.90 m^3(b) 0.94 m^3(c) 0.98 m^3(d) 0.98 m^3I have been asked this question by my college director while I was bunking the class.This key question is from Accounts topic in division P.W.D of Civil Engineering Drawing |
|
Answer» Correct answer is (B) 0.94 m^3 |
|