Laying of pipes shall proceed up grade of slopes. The error of grade shall not be rectified by packing up earth underneath the pipes.(a) True(b) FalseThis question was addressed to me in exam.This intriguing question originated from Analysis of Rates for Sanitary and Water Supply in division Analysis of Rates of Civil Engineering Drawing

Answer»

Correct choice is (a) True

Best explanation: If REQUIRED, concrete shall be used for packing. The ends of the PIPES shall be kept closed to keep DIRT, MUD and foreign materials, out. Adequate provision shall be made to prevent floating of pipe in the event of flooding of trenches. The body of the pipe for its entire length shall rest on an even bed in the trench and places shall be excavated to receive the collar for the PURPOSE of jointing.