Rigid pavements are generally constructed in three layers – a prepared subgrade, base or sub base, and a _______________(a) RCC(b) Concrete slab(c) Steel(d) Cement slabI had been asked this question in an interview for internship.This intriguing question originated from Analysis of Rate of Road Work in portion Analysis of Rates of Civil Engineering Drawing |
|
Answer» The correct OPTION is (b) Concrete slab |
|